Skip to main content
Builder Delivery Track Record

Bangalore Builder Reputation Index 2026

RERA QPR completion data · NCLT insolvency flags · Brickplot verdict distribution

51
Builders tracked
652+
Projects analysed
1
NCLT / insolvency flags
49%
Portfolio avg QPR

What this page measures — and what it doesn't

This index aggregates three independent signals for each builder: (1) RERA QPR completion % — the builder's own sworn quarterly declaration of construction progress across all tracked projects; (2) NCLT / IBC proceedings — active insolvency petitions detected by Brickplot's weekly eCourts scraper; (3) Brickplot verdict distribution— how many of the builder's projects score Buy Now (≥8.0) vs Avoid (<6.5) on our independent 11-axis formula.

This page covers Karnataka RERA data (Bangalore-focused). It does not capture builder performance in other states. QPR completion % is a portfolio-level average — early-stage projects naturally start low. NCLT status is the stronger negative signal. Data refreshes daily from live portals.

Builder Track Record Table

Sorted by risk level: NCLT-flagged builders first, then by Avoid count, then by completion %. Click any builder name to see all scored projects.

BuilderProjectsAvg QPR %NCLT StatusBuy NowAvoid
Mantri Developers725%⚠ Proceedings02
Prestige Group6240%Clean2234
Godrej Properties5249%Clean1417
Brigade Group4656%Clean2116
Sobha Limited5547%Clean1914
Assetz Property Group2254%Clean312
Adarsh Developers2257%Clean412
Puravankara Limited3452%Clean128
Sattva Group3637%Clean167
Mana Projects837%Clean07
Century Real Estate1439%Clean07
Embassy Group1250%Clean57
Sowparnika1537%Clean66
Sumadhura Group853%Clean05
Shriram Properties1956%Clean85
Nvt822%Clean34
SBR Group452%Clean04
Lodha Group76%Clean13
NCC Urban719%Clean23
Vaishnavi Group819%Clean23
Rohan Builders620%Clean13
Casagrand Builder1736%Clean63
Birla Estates843%Clean23
Abhee953%Clean23
Vaswani356%Clean03
Concorde Group939%Clean52
SNN Builders1056%Clean72
Kns563%Clean12
Orchid764%Clean52
DNR Group770%Clean22
Pride1290%Clean32
TVS Emerald724%Clean31
Prestige Estates Projects1642%Clean11
Mahindra Lifespaces1054%Clean31
Signature Global458%Clean11
MJR Group365%Clean21
Arvind572%Clean41
Radiance675%Clean11
Legacy385%Clean01
My Home Constructions5Clean01
Lodha Group (Macrotech Developers)210%Clean20
Valmark340%Clean20
Bren Corporation342%Clean30
Aratt Builders447%Clean20
Guru Punvaanii472%Clean10
Manyata Embassy377%Clean00
Svamitva3100%Clean10
Hiranandani Group4Clean20
Urbanrise Constructions3Clean00
Mahindra Lifespace Developers3Clean00
ASBL3Clean00

How Brickplot scores builder reliability

Builder reliability enters the Brickplot 11-axis formula across three axes:

  • Axis 3 — Builder Financial Health (weight 12%): promoter pledging, debt/equity, auditor qualification, NCLT / IBC status.
  • Axis 8 — Construction & Delivery Risk (weight 9%): QPR completion percent, satellite-verified progress, days overdue on milestone, RERA extensions filed.
  • Axis 1 — Legal & Title Cleanliness (weight 16%): any litigation, court attachment, or builder conviction triggers hard caps of ≤3.9 or ≤3.5.

A builder facing active NCLT proceedings applies a hard cap of ≤3.9 to every project under that promoter entity — regardless of how good the title or location may be.

Frequently Asked Questions

Which Bangalore builders have the worst delivery track record?

Based on Brickplot's analysis of Karnataka RERA QPR data, builders with the highest share of Avoid-rated projects and NCLT flags include Mantri Developers (NCLT proceedings confirmed across multiple projects) and Lanco Hills. Builders with the lowest average QPR completion percentage — indicating slowest construction pace — include Vaishnavi Group (19% avg), NCC Urban (18.8%), and Lodha Group Bangalore projects (6.3%). A low QPR completion % does not by itself mean delay; early-stage projects naturally start low. NCLT proceedings are the stronger red flag.

How do I check if a builder is facing NCLT proceedings?

There are three ways to verify NCLT status for an Indian real estate builder: (1) Search the NCLT case portal at nclt.gov.in using the company name — look for IBC Section 7, 9, or 10 petitions filed against the developer or its SPVs. (2) Search the MCA21 portal for any Corporate Insolvency Resolution Process (CIRP) status. (3) Check Brickplot — our weekly eCourts scraper flags NCLT proceedings on every project page under the Legal Risk section. Active proceedings or admitted petitions trigger a hard score cap of ≤3.9 on the Brickplot 10-point scale.

What does QPR completion percentage mean for a builder's track record?

QPR (Quarterly Progress Report) completion percentage is a builder's own sworn declaration of how much construction work is done, filed with the state RERA authority every quarter. It is a statutory filing carrying criminal penalties for misrepresentation under RERA 2016. Average QPR completion across a builder's projects tells you whether the builder is on track across its portfolio. A builder averaging under 30% completion across projects that have been registered for more than 12 months warrants scrutiny. Brickplot cross-references QPR data with satellite imagery to detect divergence.

Which Bangalore builders have the most Buy Now rated projects?

Builders with the highest concentration of Brickplot Buy Now (score ≥8.0) ratings in Bangalore include Sobha Limited (in-house construction, strong legal artefact quality), Brigade Group (consistent RERA compliance, strongest mid-market delivery record), and Godrej Properties (JDA model with transparent RERA filings). A Buy Now rating requires score ≥8.0 across all 11 axes and no active hard caps from NCLT, flood zone, or OC non-receipt triggers.

Is Sobha better than Prestige for delivery reliability in Bangalore?

On Brickplot's Construction & Delivery Risk axis (axis 8, weight 9%), Sobha Limited consistently outperforms Prestige across their Bangalore portfolios. Sobha's in-house construction model — no subcontracting at any stage — is the primary reason. Prestige projects are more varied: township projects on Sarjapur Road and Devanahalli carry higher delivery risk than Prestige standalone towers. Prestige has a larger portfolio (62 tracked projects vs 55 for Sobha), which widens the variance. Both are clean of NCLT proceedings as of 2026.

What is Mantri Developers' current NCLT status?

Mantri Developers has active NCLT proceedings flagged across multiple Bangalore projects, including Mantri Blossom and Mantri Serenity (confirmed proceedings) and Mantri Pinnacle, Mantri Courtyard, and Mantri Energia (partial / preliminary proceedings). Projects with active NCLT proceedings receive a hard score cap of ≤3.9 on Brickplot's 10-point scale. Buyers should verify the current status directly on nclt.gov.in and consult a property lawyer before proceeding with any Mantri project.

Want a full legal + NCLT check on a specific project?

Brickplot's paid /consult delivers EC chain, RERA artefact wall, NCLT verification, and a full 11-axis score for any project in our database. Starting at ₹499.

Get a project report →
Data sources: Karnataka RERA QPR portal, eCourts / NCLT case search, Brickplot independent scoring engine. Brickplot is not affiliated with any builder or RERA authority. NCLT status reflects findings at the time of our last weekly scan — always verify at nclt.gov.in before making any purchase decision. Read our methodology.