7.4/10IN VERIFICATIONOrchid South Park
Independent Verdict Portal  ·  ₹0 Builder Commissions Accepted  ·  Formula-Scored, No Human Override
HomeAll ReviewsBangaloreOrchid South Park
Data sourced from public records (RERA portals, court filings, government registries). AI-assisted analysis · Advisory only · Not legal or financial advice. How we score →
3 OF 7 DOCUMENTS INDEPENDENTLY VERIFIEDRERA VerifiedLegal Risk · Grade A

Orchid South Park

3 of 7 documents independently verified

Bangalore · 560099
Possession
H1 2031
RERA
PRM/KA/RERA/1251/308/PR/060526/008625
Khata
B-Khata
Scale
356 units
See what we have verified →
RERA Verified
₹0 Builder Commissions
Public records · Independent analysis
Formula-Scored · No Override
Legal Risk · Grade A

The evidence file

No verdict is published for Orchid South Park until independent verification completes. These are the public records confirmed so far — and exactly what is still pending. Last re-checked 13 Jul 2026.

Independently verified artefacts
4 verified · 7 pending · Legal Risk Grade A
RERA Registration — PRM/KA/RERA/1251/308/PR/060526/008625
Project is registered with the state RERA authority. · View source ↗
Soil Bearing Capacity
Geotechnical report confirms soil supports planned structure.
NCLT / IBC Status
eCourts / NCLT scan clean
Mother Deed / Title Chain
Unbroken chain of ownership from the original allotment.
Khata (A / B)
B-Khata — regularisation gap
FSI / FAR Compliance
Built-up area is within the sanctioned floor space index.
Flood Zone Status
CWC flood category; Cat-A zones cap Location score at 5.4.
4 pending — not yet independently verified (not necessarily a red flag)
Occupancy Certificate
OC applied / pending
Encumbrance Certificate
No outstanding loans, mortgages, or charges on the title.
RERA Escrow
70% of buyer collections are held in a project-specific escrow.
Parking Ratio
Sanctioned car parks per unit; below 1.0 caps Premium+ scores.
Want this dossier as a shareable PDF? The full 11-axis breakdown with source links — formatted for your family or banker.
Free · Verdict Report
7.4/10 Independent verification in progressBangalorePossession H1 2031RERA PRM/KA/RERA/1251/308/PR/060526/008625By Goyal Hariyana Constructions
DOSSIERFILE-KA-3606

RERA Registration: PRM/KA/RERA/1251/308/PR/060526/008625 — Status: Valid · View on portal ↗

Expected Possession: H1 2031

LAST VERIFIED13 Jul 2026
NEXT RE-SCORE11 Oct 2026
POSSESSIONH1 2031
Fresh· Audited 0d ago· Next: 2026-10-11
Environmental Risk
CWC Flood Zone
Flood risk — verify with local SWD plan
Moderate flood risk — verify mitigation measures before booking.
💨
Air Quality (AQI)
103Moderate
Station: City Railway Station, Bengaluru - KSPCB · 2026-06-27
Composite Score7.4/10
Independent verification in progress
Launch tracker · independent verdict pending data
We have not yet issued a Buy / Wait / Avoid verdict on this project. RERA-verified launch data is on file; the score will publish once buyer sentiment, QPR completion, and locality AQI signals land via our weekly enrichment pipeline.
7.4

Orchid South Park is a RERA-registered residential project by Goyal Hariyana Constructions in Bangalore. On Brickplot's mechanical 11-axis formula it scores 7.4/10 — below the 8.0 mark Brickplot requires to publish a "Buy Now" verdict. 3 of 7 primary public-record documents are independently verified so far, including its RERA registration (PRM/KA/RERA/1251/308/PR/060526/008625). The verified records are listed below. Last verified 2026-07-13.

Card colour
0111-Axis Audit Scorecard

The Brickplot Score — every line audited and weighted.

11 axes weighted to sum to 100. Each axis carries its own hard caps that override the composite if triggered. Formula-scored, no human override.

Model
1-reward-forward-v9
Verdict thresholds
Buy ≥ 8.0 · Wait 6.5–7.9 · Avoid < 6.5
Hard caps triggered
Artefacts verified
3 / 7
01WT 16

Legal & Title Cleanliness

8.5/ 10partially verified
02WT 10

RERA Disclosure Quality

8.5/ 10
03WT 12

Builder Financial Health

7.5/ 10inferred
04WT 8

Verified Buyer Sentiment

6.0/ 10inferred
05WT 6

Bank Loan-Approval Depth

6.0/ 10inferred
06WT 14

Location, Infrastructure & Climate Risk

7.0/ 10
07WT 9

Value & Price Trajectory

6.5/ 10inferred
08WT 9

Construction & Delivery Risk

8.0/ 10inferred
09WT 5

Governance & Approvals Depth

8.8/ 10
10WT 6

Liveability & Build Quality

7.5/ 10partially verified
11WT 5

Investment Yield & Exit Liquidity

6.0/ 10inferred
Weighted composite
7.4/10
Verdict
Independent verification in progress
02Editorial Verdict

Independent verification in progress.

RERA verified · Legal Grade A · we have not issued a Buy / Wait / Avoid verdict yet — the records below are what we have verified so far.

Orchid South Park is among the latest RERA-approved apartment projects registered in Bengaluru North, Bengaluru Urban. It is a 356-unit development by Goyal Hariyana Constructions. Buyers researching bengaluru north new launch, RERA approved projects in bengaluru north, and ORCHID SOUTH PARK, ORCHID SOUTH PARK review, ORCHID SOUTH PARK …

Bengaluru North is part of Bengaluru Urban — a Bangalore micro-market where buyers should weigh the project against existing RERA-approved options, builder track record, and the standard 11-axis Brickplot framework.

Orchid South Park is currently a Brickplot launch tracker — meaning we have surfaced RERA filings but have not yet published the full 11-axis review. The full review unlocks once QPR or independent buyer sentiment data lands.

“Independent verification of this project is still in progress — no verdict has been issued.”
Status
Independent verification in progress
Records verified so far are listed below · formula-scored on model 1-reward-forward-v9 · no human override.

The decision — independent analysis of the public record.

01
Disclosure discipline
RERA QPRs filed and tracked. Goyal Hariyana Constructions produced complete documentation.
02
Title cleared
Legal & Title axis scored in the top band (A). EC, mother-deed and encumbrance artefacts are listed in the Trust section.
03
Construction matches
Pre-launch / awaiting first QPR. Will re-audit on filing.
04
Decision
Independent verification in progress — no verdict issued yet. The records we have confirmed are listed in the Trust section.
04Configurations

Unit mix & sizing.

Brickplot publishes only verified figures. Exact carpet areas and per-unit pricing are confirmed on request and should be cross-checked on the RERA portal before booking — we do not display estimated unit sizes.

Configurations
See RERA registration
Total units
356 (RERA)
Indicative all-in
On request
05Pricing

What it actually costs.

Per-configuration prices come from the builder cost sheet and are confirmed on request — we don't publish them as estimates. Below is Brickplot's independent valuation band for the project.

Brickplot valuation
On request
Total units
356
Includes: Base Selling Price (BSP) · floor rise · PLC · parking · clubhouse. Excludes: stamp duty (varies by state) · registration (~1%) · GST as applicable · maintenance corpus.
Tools: Is this price fair? · Stamp duty calculator · EMI calculator
07Master Plan

Site context. How it all fits.

MASTER PLAN
PENDING VERIFICATION

Site composition

  • Total areaPer RERA filing
  • TowersPer master plan
  • Total units356
  • DensityPer master plan
  • ClubhousePer amenities list
  • PoolPer amenities list
  • ParkingPer RERA filing
  • Open / landscapePer master plan
  • PossessionH1 2031
  • RERAPRM/KA/RERA/1251/308/PR/060526/008625

Banks Approved for Home Loans at Orchid South Park

14Bank APF Partners

Home-loan eligibility.

We haven't yet verified this project's approved-project-finance (APF) list, so we don't name specific lenders here. Any RERA-registered project is typically loan-eligible — confirm directly with your bank.

09Location Intelligence

The micromarket.

Sy no 60/17, 60/23 and 60/24 Hebbagodi Village , Attibele Hobli , Anekal , Bengaluru Urban, Karnataka - 560099. Drive-time, civic infrastructure and location risks — verified against OSM and ground reports.

Bangalore · 56009912.76°N · 77.76°E

Drive-time matrix

Map-verified drive-times for this project are pending. Exact distances depend on the tower and gate — open the map and test your own commute at peak hours before booking.
⚠ Air quality watchlist
City Railway Station, Bengaluru - KSPCB reading 103 (poor band). Plan air filtration for sensitive members.
⚠ Flood zone flag
Project sits in CWC Low — South Bangalore elevated terrain; Suvarnamukhi/Vrishabhavathi upper catchment; not in BBMP flood-risk list. Verify soil drainage and basement waterproofing.
08Amenities

Designed for residents.

Indicative amenities list — verify with the developer brochure before booking.

Clubhouse
Swimming Pool
Gym
Kids' Play Area
Landscaped Gardens
24/7 Security
Power Backup
CCTV Surveillance
Visitor Parking
Indoor Games
Jogging Track
Multipurpose Hall
03Project Specifications

Hard facts, not marketing language.

Total area
Towers
Floors
Total units
356 units
Per RERA registration
Launch
2026-05-01
RERA-registered launch
Possession
H1 2031
±6 mo typical variance
K-RERA reg.
PRM/KA/RERA/1251/308/PR/060526/008625
State RERA portal · live
Approval body
BBMP
Open / green
Parking ratio
Clubhouse
STP capacity

Site evidence, not renders.

No marketing CGI. Construction evidence comes from the builder’s own RERA filings and Sentinel-2 satellite imagery — each stamped with its source. Slots without a verified image stay blank, never stock.

0 images sourced & provenance-labelled · 5 slots honestly blank — no stock, no CGI substitute

QPR filing ledger

Every RERA Quarterly Progress Report, as the builder filed it — claimed %, possession date, and the photographs attached to each filing, cross-checked against our satellite estimate.

Pre-launch — no QPR filed yet. First Quarterly Progress Report due once construction is registered on the KRERA portal. We publish it — with its photos and our satellite cross-check — the day it lands on the KRERA portal.
Launch + RERA
✓ Launch + RERA
PRM/KA/RERA/1251/308/PR/060526/008625
Foundation
Excavation
Basement · raft
Build
Tower shell
Pending
Fit-out
Façade + MEP
Pending
Handover
Handover
OC + possession
12Builder Track Record

Goyal Hariyana Constructions7.5 / 10 on our builder matrix.

Goyal Hariyana Constructions

Developer of Orchid South Park. Brickplot tracks builder track record under Builder Financial Health (Axis A·03) and Construction & Delivery Risk (Axis A·08).
No NCLT proceedings
Builder matrix
7.5/10
Above-average track record
15Buyer Voices

Buyer sentiment in progress.

Buyer sentiment for this project is still in synthesis. We typically wait until at least 8 verified buyer reviews are on the public record before publishing voices, to avoid cherry-picking.
Brickplot Editorial
Methodology note · 90-day cycle
16Frequently Asked

Buyer questions, answered.

Has Brickplot issued a verdict on Orchid South Park?
We haven't completed independent verification of Orchid South Park, so we have not issued a Buy/Wait/Avoid verdict. Below are the public records we have verified and what is still pending.
Is Orchid South Park RERA registered?
RERA registration PRM/KA/RERA/1251/308/PR/060526/008625 is on file (source: Karnataka RERA portal). Verify the current status directly on the portal before relying on it.
Has Orchid South Park received its Occupancy Certificate (OC)?
We have not independently confirmed an Occupancy Certificate for Orchid South Park. Not yet verified.
Is the title of Orchid South Park encumbrance-free?
We have not independently reviewed the encumbrance certificate for Orchid South Park. Not yet verified.
Is Brickplot paid by builders for reviews?
No. Brickplot accepts no commission, retainer, or sponsorship from any builder or developer.
·Editorial Download

Get the full Orchid South Park verdict report.

All 11 axes with evidence · artefact wall with source links · drive-time matrix · comparable deltas · K-RERA cross-check.

How we scoreFair Price CalcAll ProjectsCompareRERA GuideGet a consultPlot Reviews
13Comparable Projects

Other Goyal projects and peer comps.

Comparables under synthesis. Browse our full Bangalore index meanwhile.

Title & Encumbrance Trail

Title chain not yet verified for this project. Source: pending state portal pull.

Have questions? Chat with us on WhatsApp

Get quick answers from our property experts — no login needed.

Chat on WhatsApp →

Related Insights

Builder Track Record Index →Bangalore Flood Risk Map →How to check builder reliability →11-step apartment evaluation →Property title verification guide →

Orchid South Park — key facts

RERA registration
PRM/KA/RERA/1251/308/PR/060526/008625
Possession (RERA-promised)
2031-04-30
Occupancy Certificate
pending
Khata
B-Khata
Locality
Attibele, South Bangalore
City
Bangalore
Builder
Goyal Hariyana Constructions
Brickplot score
7.4 / 10 (11-axis formula)

Facts reproduced from public records (RERA portal, sub-registrar, municipal registers). Last checked 2026-07-13. Verify independently before any decision.

Orchid South Park scores 7.4/10 (Wait) on Brickplot's 11-axis analysis — RERA-registered, no builder NCLT proceedings, possession 2031-04-30.

Free downloads — no payment, optional email

Two artefacts for Orchid South Park you can save, print, or forward to your family — built on the same public-record data as the page above. ₹0 from builders, ever.

Want verified RERA Form A + EC + analyst interpretation? See /consult (₹1,999 to ₹4,999, all reader-paid, zero builder money).

Prelaunch Project Assessment + Expert Call

TIER 1 · ₹1,999

For pre-launch or pre-RERA projects: an expert evaluation of registration timeline, project readiness, and risk factors for Orchid South Park, plus a 30-minute video consultation with our analyst to answer your specific questions.

7-day email course — "How to vet a Bangalore apartment"

Free. 7 emails over 7 days. One concept per day (RERA Form A, builder health, fair price, site visit, negotiation, decision matrix). Written by Rohtash Tiwari, Brickplot Editor. No spam, no upsell barrage — just the 5-minute action per day.

7 emails over 7 days. Then we stop. privacy policy.

Verified Documents — analyst-fulfilled, 48 hours

TIER 4 · ₹4,999

The full evidence pack + expert call for Orchid South Park: verified RERA Form A + B + sub-registrar EC + OC + title chain audit + Khata + NCLT/eCourts citations + 8–12 page analyst interpretation report + a 30-minute expert video call. Documents authenticated against public registries with retrieval timestamps + IT Act §65B-style attribution. Project page flips to Grade A on delivery if score and verified count thresholds clear.

Goyal Hariyana Constructions — delivery track record

From state RERA portals + Brickplot review database. Aggregate metrics where individual records are unavailable.

On-time delivery
Avg delay (months)
Projects on file
NCLT exposure

Per-project delivery history isn't on file yet for Goyal Hariyana Constructions. Aggregate metrics above are derived from RERA registrations + Brickplot's review database. If you have direct evidence of a specific delivery outcome we missed, please email corrections@brickplot.com.

We refresh builder records weekly from state RERA portals + eCourts + NCLT. Delivery dates are taken from the latest RERA QPR filing where available.

Resale liquidity in 5 years

How easy will it be to sell this unit? Benchmarked against Attibele, South Bangalore.

5.0 / 10
Difficult resale

Materially harder than locality average. Plan for longer holding period or larger price concession.

See the 5-input breakdown
Locality resale velocity (30%)
5.0
Price appreciation trend (20%)
5.0
Builder reputation (20%)
5.0
Unit configuration demand (15%)
5.0
Infrastructure trajectory (15%)
5.0

Inputs marked 5.0 are placeholders where Brickplot doesn't yet have that data for this project. The full algorithm is published at brickplot.com/why-we-score.

Quick loan eligibility check — across 8 banks

Rule-based estimate. Calculations happen in your browser — no data sent to Brickplot or any bank. Indicative only; banks apply their own credit scoring before sanction.

Enter your monthly take-home salary above to see eligible loan amounts.

Neighbourhood scorecard — Attibele, South Bangalore

What surrounds this project within ~3 km. Source: OSM points-of-interest + Brickplot commute matrix.

Schools (3 km)
Hospitals + clinics
Sparse
Nearest metro
Bus routes nearby
Drive-time to top employment hubs in Bangalore
Outer Ring Road tech parks
MG Road
Whitefield
Electronic City
Manyata Tech Park

Granular POI data is not yet populated for this locality. We refresh OSM data weekly; newer entries land within 7 days of locality additions to Brickplot.

Distance estimates use straight-line + OSM road-network heuristics; actual commute depends on traffic, time of day, and last-mile connectivity. See the full Attibele, South Bangalore locality hub →

Statutory approvals on file

What we verified against BBMP / KSPCB / BWSSB at last refresh

0 / 6 verified
Khata
Property registration with BBMP
Pending
Building Plan
Plan approved by BBMP
Not yet verified
Dev Plan
Master layout + density compliance
Not yet verified
Fire NOC
State Fire Department clearance
Not yet verified
Pollution NOC
KSPCB / CPCB consent to establish & operate
Not yet verified
Water NOC
BWSSB / municipal water supply approval
Not yet verified
Height NOC
AAI height clearance (if applicable)
N/A

Verification is point-in-time. Always re-verify with the issuing authority before booking — some approvals can be revoked or expire. We refresh this list on every project page refresh; see the page's last-updated date for the timestamp.