Corrections Log

Every verified change to a published fact — what was wrong, what changed, and the record we checked it against. Public, dated, and kept whether the correction flatters us or not.

How to report an error

  1. Email corrections@brickplot.com with the page URL and the specific error.
  2. We acknowledge within 24 hours and fact-check within 48 hours.
  3. Verified errors are corrected within 24 hours, with a visible correction notice at the top of the affected page.
  4. Every correction lands here — dated, with what was wrong, what changed, and the record we checked it against.

We do not charge for correction requests, and we do not require the reporter's identity (though contact details help us reply with the resolution).

Log

8 corrections, newest first. Where a correction moved a score, the direction it moved is stated.

Every apartment project near a documented BBMP flood hotspot — 93 projects

What was wrong

We published a hard cap that limited any project near a documented flood hotspot to a maximum score of 5.4, and described it as applying where there was "no engineered mitigation". Three things were wrong with it. We had no mitigation data for any project, so the second half of the rule was never tested and every project was treated as unmitigated. The Location & Climate axis was already reduced to 5.4 on 91 of these 93 projects — a value that appears on none of the other 6,810 — so the cap charged the same hazard a second time. And 31 of the 93 were flagged not by measuring the site but by matching the project’s locality name against a hotspot list.

What changed

The cap was retired. Flood-hotspot proximity now does two things and no more: it lowers the Location & Climate axis, which carries 14 of the 100 weight points, and it withholds a Buy verdict regardless of the total score. That Buy restriction was already in force and is unchanged; it is now stated publicly, which it had not been. Where a developer evidences engineered mitigation for a specific project, we record it and lift the restriction. Withholding a recommendation on incomplete evidence is fair; publishing a two-point downgrade on it is not.

Effect on what we published

No published verdict changed — none of these projects could carry a Buy before or after. 82 projects keep the score they had rather than dropping by an average of 2.2 points.

Checked against

Axis-6 distribution across all 6,903 scored projects; the flood basis string on each of the 93; and the Buy-suppression path in the verdict gate, which was left untouched.

Every page showing an 11-axis score, and the paid report generator

What was wrong

Three different versions of the 11-axis weightings were live at the same time. The scoring page, the methodology page and the generator that produces paid reports each used a different set, so a weight a reader saw was not necessarily the weight the arithmetic used.

What changed

All nine places where the weights are declared were aligned to the canonical set held by the scoring engine. A dated entry was added to the scoring changelog, which until then carried no record of the 2026-06-02 reweight and so contradicted the methodology page on 7 of 11 axes.

Checked against

A script that reads all nine declarations and asserts each set sums to 100 and matches the canonical order.

The hard-cap list published on the scoring and methodology pages

What was wrong

A flood-risk cap was labelled "CWC Category-A flood zone". Central Water Commission Category-A is a major-river flood-forecast classification. Bengaluru has no CWC river category — it floods from lake overflow and storm-water drain failure, which is a different hazard from the one the label named.

What changed

The cap was renamed "BBMP flood-hotspot proximity, no engineered mitigation" and its wording brought in line with what is actually measured. The threshold itself was not changed.

Effect on what we published

Scores fell on pages where the cap applies. No project gained a Buy from this change, and the underlying flag had been visible on those pages throughout.

Checked against

CWC flood-forecasting scope; BBMP flood-vulnerability records for the affected wards.

Nikoo Homes VI Phase-2, Kogilu — one project page

What was wrong

The page carried another phase's records: the RERA registration number, escrow bank and survey number belonging to Phase V, plus a parking ratio and floor-space figure taken from a different block altogether.

What changed

Corrected in place to the Phase-2 record — RERA PRM/KA/RERA/1251/309/PR/160124/006550, promoter Bhartiya Urban, Survey 53 Kogilu, Standard Chartered escrow — and the mis-attributed parking and floor-space figures were deleted rather than replaced, because no verified figure existed for them.

Effect on what we published

Removing the mis-attributed figures dropped the count of independently verified documents on this page to three, below the five we require before publishing a verdict. The page had previously looked close to a Buy on the strength of evidence that belonged to a different phase. It now publishes no verdict at all.

Checked against

The project's own 19-document KRERA filing set, including the registered joint-development agreement, encumbrance certificate, khata, mutation record and the portal's bank-details record.

Mana The Right Life — one project page, and the monitor that watches every page

What was wrong

Our change monitor read the word "withdrawn" out of the sentence "Amount withdrawn from the bank for the purpose of the project" — a routine escrow drawdown line — and reported the registration as withdrawn. It also read "100% complete" out of a page-layout style value and an escrow account label. Separately, the approving authority was recorded as Mangaluru UDA, and the project start date was wrong.

What changed

The monitor now reads only the labelled status field instead of matching text anywhere on the page. The authority was corrected to the Bangalore Development Authority and the start date corrected against the filing.

Effect on what we published

A second correction on the same page ran against us: the land record had been described as a BBMP A-Khata when it is a Gram Panchayat e-Khata on converted land. That correction lowered the page's legal-cleanliness score rather than raising it.

Checked against

The project's full KRERA detail filing (235 documents), where the live status read "New Project Launch, 24% complete" — matching the promoter's own quarterly progress report.

349 project pages carrying a flood-risk flag

What was wrong

A bare "category-A" flood token had been applied to 349 projects with no source behind it, and it triggered a hard ceiling of 5.4 on the overall score. 151 of those projects had nothing more specific than "Bangalore" recorded as their locality, and the flag was firing on demonstrably elevated ground, including the Whitefield ridge and Yelahanka.

What changed

We built a sourced hotspot dataset — 84 locations with coordinates, radius and a stated basis, drawn from BBMP vulnerable storm-water-drain listings and published flood-prone-area records — then reclassified every flagged project by measured distance to it.

Effect on what we published

184 of 290 flags — 63% — were false and were corrected, releasing scores that had been artificially capped. 106 were kept where the flood risk is documented. Two of the twelve project pages published here retain the classification: it was re-examined and stood.

Checked against

BBMP vulnerable storm-water-drain listings, published Bengaluru flood-prone-area records, and per-project coordinates.

1,226 project pages carrying a committed RERA registration number

What was wrong

One project was found carrying a RERA registration number belonging to a different project. An audit of every page with a committed number found 240 that needed review.

What changed

23 wrong registration numbers were removed, together with the escrow, approving-authority, progress-report and document records that had been attached on the strength of them. 32 pages filed under the wrong city were corrected. Where a correct number could be established from the public register it was recorded separately as a candidate rather than promoted automatically, because promoting it is an editorial decision.

Effect on what we published

A guard was added upstream: a close name match in a district outside Bengaluru now routes to human review instead of being committed automatically, which is the specific path that produced the original error.

Checked against

State RERA registers, checked per project.

437 project pages

What was wrong

The encumbrance-certificate field on 437 pages had been populated with escrow bank text. The effect was that a page could present an encumbrance certificate as verified when no encumbrance certificate had been read.

What changed

All 437 were cleared, and the field is now written only from a document that has actually been retrieved and read.

Checked against

Direct inspection of the stored values against the documents they claimed to represent.

Caught before publication

These changed nothing a reader saw, so they are not corrections. They are here because the decision not to publish is part of the record too.

Godrej Madison Avenue, Kokapet, Hyderabad

A folder of legal documents supplied for this project turned out to contain the encumbrance certificate, title documents and RERA filing for a different Godrej project — Brooklyn Avenue in Kukatpally, roughly 25 km away. Both project names end in "Avenue", and the folder was named for neither. Scoring the project from those documents would have attributed one project's clean title record to another. We stopped, published nothing, and left the project's existing state — verification in progress — unchanged pending its own documents.

Why we keep this public

A public correction record is the single strongest good-faith signal an editorial publisher can offer. Indian courts (see Lodha Group v. Krishnaraj Rao, Bombay HC 26 April 2019) have repeatedly recognised that publishers who maintain transparent correction practices enjoy stronger fair-comment protection. Keeping this log public is also our commitment to readers: the score on every project page is only as good as the underlying facts. When we are wrong, we publish what was wrong, what we fixed, and how we verified the fix.