7.4/10IN VERIFICATIONMana Skanda The Right Life T6
Independent Verdict Portal  ·  ₹0 Builder Commissions Accepted  ·  Formula-Scored, No Human Override
HomeAll ReviewsMana Skanda The Right Life T6
Data sourced from public records (RERA portals, court filings, government registries). AI-assisted analysis · Advisory only · Not legal or financial advice. How we score →
6 OF 7 DOCUMENTS INDEPENDENTLY VERIFIEDRERA VerifiedLegal Risk · Grade A

Mana Skanda The Right Life T6

6 of 7 documents independently verified

India
Possession
Jun 2030
Configs
3 BHK
RERA
PRM/KA/RERA/1251/308/PR/210725/007941
Scale
126 units · 1 towers
See what we have verified →
RERA Verified
₹0 Builder Commissions
Public records · Independent analysis
Formula-Scored · No Override
Legal Risk · Grade A

The evidence file

No verdict is published for Mana Skanda The Right Life T6 until independent verification completes. These are the public records confirmed so far — and exactly what is still pending. Last re-checked 20 Jun 2026.

Independently verified artefacts
4 verified · 8 pending · Legal Risk Grade A
RERA Registration — PRM/KA/RERA/1251/308/PR/210725/007941
Project is registered with the state RERA authority. · View source ↗
NCLT / IBC Status
eCourts / NCLT scan clean
Mother Deed / Title Chain
Unbroken chain of ownership from the original allotment.
Bank APF list — 1 lender
Canara · loan-approved
Occupancy Certificate
OC pending — project is under construction
FSI / FAR Compliance
Built-up area is within the sanctioned floor space index.
RERA Escrow
Escrow bank on record
Parking Ratio
Sanctioned car parks per unit; below 1.0 caps Premium+ scores.
Flood Zone Status
CWC flood category; Cat-A zones cap Location score at 5.4.
3 pending — not yet independently verified (not necessarily a red flag)
Khata (A / B)
Property tax record class. A-Khata is loanable; B is not.
Encumbrance Certificate
No outstanding loans, mortgages, or charges on the title.
Soil Bearing Capacity
Geotechnical report confirms soil supports planned structure.
Want this dossier as a shareable PDF? The full 11-axis breakdown with source links — formatted for your family or banker.
Free · Verdict Report
7.4/10 Independent verification in progressIndiaRERA PRM/KA/RERA/1251/308/PR/210725/007941By Mana Projects
DOSSIERFILE-IN-88973

RERA Registration: PRM/KA/RERA/1251/308/PR/210725/007941 — Status: Valid · View on portal ↗

LAST VERIFIED20 Jun 2026
NEXT RE-SCORE12 Oct 2026
Fresh· Audited 24d ago· Next: 2026-10-12
Environmental Risk
CWC Flood Zone
Safe — No CWC flood risk
No CWC flood zone designation for this location.
💨
Air Quality (AQI)
103Moderate
Station: City Railway Station, Bengaluru - KSPCB · 2026-06-27
Composite Score7.4/10
Independent verification in progress
Watch
Launch tracker · independent verdict pending data
We have not yet issued a Buy / Wait / Avoid verdict on this project. RERA-verified launch data is on file; the score will publish once buyer sentiment, QPR completion, and locality AQI signals land via our weekly enrichment pipeline.
7.4

Mana Skanda The Right Life T6 is a RERA-registered residential project by Mana Projects. On Brickplot's mechanical 11-axis formula it scores 7.4/10 — below the 8.0 mark Brickplot requires to publish a "Buy Now" verdict. 6 of 7 primary public-record documents are independently verified so far, including its RERA registration (PRM/KA/RERA/1251/308/PR/210725/007941). The verified records are listed below. Last verified 2026-06-20.

Card colour
0111-Axis Audit Scorecard

The Brickplot Score — every line audited and weighted.

11 axes weighted to sum to 100. Each axis carries its own hard caps that override the composite if triggered. Formula-scored, no human override.

Model
1-reward-forward-v9
Verdict thresholds
Buy ≥ 8.0 · Wait 6.5–7.9 · Avoid < 6.5
Hard caps triggered
Artefacts verified
6 / 7
01WT 16

Legal & Title Cleanliness

8.5/ 10partially verified
02WT 10

RERA Disclosure Quality

9.5/ 10
03WT 12

Builder Financial Health

6.7/ 10inferred
04WT 8

Verified Buyer Sentiment

5.0/ 10inferred
05WT 6

Bank Loan-Approval Depth

7.5/ 10
06WT 14

Location, Infrastructure & Climate Risk

7.0/ 10
07WT 9

Value & Price Trajectory

7.8/ 10inferred
08WT 9

Construction & Delivery Risk

6.5/ 10
09WT 5

Governance & Approvals Depth

8.5/ 10
10WT 6

Liveability & Build Quality

7.5/ 10
11WT 5

Investment Yield & Exit Liquidity

5.7/ 10inferred
Weighted composite
7.4/10
Verdict
Independent verification in progress
02Editorial Verdict

Independent verification in progress.

RERA verified · Legal Grade A · 7% built · we have not issued a Buy / Wait / Avoid verdict yet — the records below are what we have verified so far.

Mana Skanda The Right Life T6 is the Tower 6 luxury phase of the Mana Skanda The Right Life integrated township, developed by Neobuild Ventures LLP (a Mana Projects × Skanda joint venture) on Sarjapur–Varthur Road, Bengaluru. T6 is a single G+32 tower of 126 apartmen…

This is a distinct RERA registration from the township's first phase (The Right Life, towers 1–3, 288 units); T6 has its own approvals, escrow account and completion timeline. Always verify the registration at the KRERA portal before booking.

T6 sits in Chikkavaderapura / Heggondanahalli, Sarjapura Hobli, Anekal taluk on the Sarjapur–Varthur Road corridor of East Bengaluru — a deep IT-employment catchment (Wipro SEZ, RGA Tech Park, ELCIA, Outer Ring Road). Air quality is moderate (AQI ~57) and the site is in a low flood-risk zone. The key infrastructure watch-item is …

“Independent verification of this project is still in progress — no verdict has been issued.”
Status
Independent verification in progress
Records verified so far are listed below · formula-scored on model 1-reward-forward-v9 · no human override.

The decision — independent analysis of the public record.

01
Disclosure discipline
RERA QPRs filed and tracked. Mana Projects produced complete documentation.
02
Title cleared
Legal & Title axis scored in the top band (A). EC, mother-deed and encumbrance artefacts are listed in the Trust section.
03
Construction matches
7% built per latest RERA QPR. QPR filed 2025-12-31.
04
Decision
Independent verification in progress — no verdict issued yet. The records we have confirmed are listed in the Trust section.
04Configurations

Unit mix & sizing.

Brickplot publishes only verified figures. Exact carpet areas and per-unit pricing are confirmed on request and should be cross-checked on the RERA portal before booking — we do not display estimated unit sizes.

Configurations
3 BHK
Total units
126 (RERA)
Indicative all-in
On request
05Pricing

What it actually costs.

Per-configuration prices come from the builder cost sheet and are confirmed on request — we don't publish them as estimates. Below is Brickplot's independent valuation band for the project.

Brickplot valuation
On request
Total units
126
Includes: Base Selling Price (BSP) · floor rise · PLC · parking · clubhouse. Excludes: stamp duty (varies by state) · registration (~1%) · GST as applicable · maintenance corpus.
Tools: Is this price fair? · Stamp duty calculator · EMI calculator
07Master Plan

Site context. How it all fits.

MASTER PLAN
PENDING VERIFICATION

Site composition

  • Total areaPer RERA filing
  • Towers1
  • Total units126
  • DensityPer master plan
  • ClubhousePer amenities list
  • PoolPer amenities list
  • Parking3.0 / unit
  • Open / landscapePer master plan
  • PossessionJun 2030
  • RERAPRM/KA/RERA/1251/308/PR/210725/007941

Banks Approved for Home Loans at Mana Skanda The Right Life T6

Canara

14Bank APF Partners

Home loans pre-approved with 1 lender.

APF means the lender has already vetted title, RERA, and construction status — your individual loan moves faster.

CanaraCanara Bank
09Location Intelligence

The micromarket.

India. Drive-time, civic infrastructure and location risks — verified against OSM and ground reports.

India12.90°N · 77.75°E

Drive-time matrix

Map-verified drive-times for this project are pending. Exact distances depend on the tower and gate — open the map and test your own commute at peak hours before booking.
⚠ Air quality watchlist
City Railway Station, Bengaluru - KSPCB reading 103 (poor band). Plan air filtration for sensitive members.
⚠ Flood zone flag
Project sits in CWC low-risk. Verify soil drainage and basement waterproofing.
08Amenities

Designed for residents.

Indicative amenities list — verify with the developer brochure before booking.

Clubhouse
Swimming Pool
Gym
Kids' Play Area
Landscaped Gardens
24/7 Security
Power Backup
CCTV Surveillance
Visitor Parking
Indoor Games
Jogging Track
Multipurpose Hall
03Project Specifications

Hard facts, not marketing language.

Total area
Towers
1 towers
Floors
Total units
126 units
Per RERA registration
Launch
July 2025
RERA-registered launch
Possession
Jun 2030
K-RERA reg.
PRM/KA/RERA/1251/308/PR/210725/007941
State RERA portal · live
Approval body
Local body
Open / green
Parking ratio
3.0 / unit
Basement · ≥ 1.0 ✓
Clubhouse
STP capacity

Site evidence, not renders.

No marketing CGI. Construction evidence comes from the builder’s own RERA filings and Sentinel-2 satellite imagery — each stamped with its source. Slots without a verified image stay blank, never stock.

0 images sourced & provenance-labelled · 5 slots honestly blank — no stock, no CGI substitute

QPR filing ledger

Every RERA Quarterly Progress Report, as the builder filed it — claimed %, possession date, and the photographs attached to each filing, cross-checked against our satellite estimate.

Pre-launch — no QPR filed yet. First Quarterly Progress Report due ~2025-12-31. We publish it — with its photos and our satellite cross-check — the day it lands on the KRERA portal.
Launch + RERA
✓ Launch + RERA
PRM/KA/RERA/1251/308/PR/210725/007941
Foundation
Excavation
Basement · raft
Build
Tower shell
Pending
Fit-out
Façade + MEP
Pending
Handover
Handover
OC + possession
12Builder Track Record

Mana Projects6.7 / 10 on our builder matrix.

Mana Projects

Developer of Mana Skanda The Right Life T6. Brickplot tracks builder track record under Builder Financial Health (Axis A·03) and Construction & Delivery Risk (Axis A·08).
No NCLT proceedings
Builder matrix
6.7/10
Mixed history — verify per project
15Buyer Voices

Buyer sentiment in progress.

Buyer sentiment for this project is still in synthesis. We typically wait until at least 8 verified buyer reviews are on the public record before publishing voices, to avoid cherry-picking.
Brickplot Editorial
Methodology note · 90-day cycle
16Frequently Asked

Buyer questions, answered.

Has Brickplot issued a verdict on Mana Skanda The Right Life T6?
We haven't completed independent verification of Mana Skanda The Right Life T6, so we have not issued a Buy/Wait/Avoid verdict. Below are the public records we have verified and what is still pending.
Is Mana Skanda The Right Life T6 RERA registered?
RERA registration PRM/KA/RERA/1251/308/PR/210725/007941 is on file (source: state RERA portal). Verify the current status directly on the portal before relying on it.
Has Mana Skanda The Right Life T6 received its Occupancy Certificate (OC)?
We have not independently confirmed an Occupancy Certificate for Mana Skanda The Right Life T6. Not yet verified.
Is the title of Mana Skanda The Right Life T6 encumbrance-free?
We have not independently reviewed the encumbrance certificate for Mana Skanda The Right Life T6. Not yet verified.
Is Brickplot paid by builders for reviews?
No. Brickplot accepts no commission, retainer, or sponsorship from any builder or developer.
·Editorial Download

Get the full Mana Skanda The Right Life T6 verdict report.

All 11 axes with evidence · artefact wall with source links · drive-time matrix · comparable deltas · K-RERA cross-check.

How we scoreFair Price CalcAll ProjectsCompareRERA GuideGet a consultPlot Reviews

Title & Encumbrance Trail

Deed chain and encumbrance status sourced from state Sub-Registrar and Kaveri / IGR portals. Only public legal-document metadata is shown — buyer and seller names are excluded per DPDP Act 2023.

Title chain
Not verified
Depth not reported
Encumbrance
Clear
No active mortgagee on record
Auction notices
None on record
No IBBI or bank SARFAESI notice matched

Have questions? Chat with us on WhatsApp

Get quick answers from our property experts — no login needed.

Chat on WhatsApp →

Related Insights

Builder Track Record Index →How to check builder reliability →11-step apartment evaluation →Property title verification guide →

Mana Skanda The Right Life T6 — key facts

RERA registration
PRM/KA/RERA/1251/308/PR/210725/007941
Khata
Gram Panchayat e-Khata (Form 11B) - DC-converted, Anekal; not BBMP A-Khata
Locality
Sarjapur Road
Builder
Mana Projects
Brickplot score
7.4 / 10 (11-axis formula)
Construction progress (RERA QPR)
7% as of 2025-12-31

Facts reproduced from public records (RERA portal, sub-registrar, municipal registers). Last checked 2026-06-20. Verify independently before any decision.

Mana Skanda The Right Life T6 scores 7.4/10 (Wait) on Brickplot's 11-axis analysis — RERA-registered, approved by 1 bank including Canara, no builder NCLT proceedings.

Free downloads — no payment, optional email

Two artefacts for Mana Skanda The Right Life T6 you can save, print, or forward to your family — built on the same public-record data as the page above. ₹0 from builders, ever.

Want verified RERA Form A + EC + analyst interpretation? See /consult (₹1,999 to ₹4,999, all reader-paid, zero builder money).

Prelaunch Project Assessment + Expert Call

TIER 1 · ₹1,999

For pre-launch or pre-RERA projects: an expert evaluation of registration timeline, project readiness, and risk factors for Mana Skanda The Right Life T6, plus a 30-minute video consultation with our analyst to answer your specific questions.

7-day email course — "How to vet a Bangalore apartment"

Free. 7 emails over 7 days. One concept per day (RERA Form A, builder health, fair price, site visit, negotiation, decision matrix). Written by Rohtash Tiwari, Brickplot Editor. No spam, no upsell barrage — just the 5-minute action per day.

7 emails over 7 days. Then we stop. privacy policy.

Verified Documents — analyst-fulfilled, 48 hours

TIER 4 · ₹4,999

The full evidence pack + expert call for Mana Skanda The Right Life T6: verified RERA Form A + B + sub-registrar EC + OC + title chain audit + Khata + NCLT/eCourts citations + 8–12 page analyst interpretation report + a 30-minute expert video call. Documents authenticated against public registries with retrieval timestamps + IT Act §65B-style attribution. Project page flips to Grade A on delivery if score and verified count thresholds clear.

Mana Projects — delivery track record

From state RERA portals + Brickplot review database. Aggregate metrics where individual records are unavailable.

On-time delivery
Avg delay (months)
Projects on file
NCLT exposure

Per-project delivery history isn't on file yet for Mana Projects. Aggregate metrics above are derived from RERA registrations + Brickplot's review database. If you have direct evidence of a specific delivery outcome we missed, please email corrections@brickplot.com.

We refresh builder records weekly from state RERA portals + eCourts + NCLT. Delivery dates are taken from the latest RERA QPR filing where available.

Resale liquidity in 5 years

How easy will it be to sell this unit? Benchmarked against Sarjapur Road.

5.0 / 10
Difficult resale

Materially harder than locality average. Plan for longer holding period or larger price concession.

See the 5-input breakdown
Locality resale velocity (30%)
5.0
Price appreciation trend (20%)
5.0
Builder reputation (20%)
5.0
Unit configuration demand (15%)
5.0
Infrastructure trajectory (15%)
5.0

Inputs marked 5.0 are placeholders where Brickplot doesn't yet have that data for this project. The full algorithm is published at brickplot.com/why-we-score.

Quick loan eligibility check — across 8 banks

Rule-based estimate. Calculations happen in your browser — no data sent to Brickplot or any bank. Indicative only; banks apply their own credit scoring before sanction.

Enter your monthly take-home salary above to see eligible loan amounts.

Neighbourhood scorecard — Sarjapur Road

What surrounds this project within ~3 km. Source: OSM points-of-interest + Brickplot commute matrix.

Schools (3 km)
Hospitals + clinics
Sparse
Nearest metro
Bus routes nearby
Drive-time to top employment hubs in bangalore
Outer Ring Road tech parks
MG Road
Whitefield
Electronic City
Manyata Tech Park

Granular POI data is not yet populated for this locality. We refresh OSM data weekly; newer entries land within 7 days of locality additions to Brickplot.

Distance estimates use straight-line + OSM road-network heuristics; actual commute depends on traffic, time of day, and last-mile connectivity. See the full Sarjapur Road locality hub →

Statutory approvals on file

What we verified against BBMP / KSPCB / BWSSB at last refresh

0 / 6 verified
Khata
Property registration with BBMP
Pending
Building Plan
Plan approved by BBMP
Not yet verified
Dev Plan
Master layout + density compliance
Not yet verified
Fire NOC
State Fire Department clearance
Not yet verified
Pollution NOC
KSPCB / CPCB consent to establish & operate
Not yet verified
Water NOC
BWSSB / municipal water supply approval
Not yet verified
Height NOC
AAI height clearance (if applicable)
N/A

Verification is point-in-time. Always re-verify with the issuing authority before booking — some approvals can be revoked or expire. We refresh this list on every project page refresh; see the page's last-updated date for the timestamp.