Radiance Platinum
Based on 105 verified buyer reviews, a site visit in Apr 2026, and the builder’s delivery track record (40+ delivered · 80% on-time).
How we arrived at 7.2/10
Six weighted axes, each scored against live evidence. Here is the exact math for Radiance Platinum.
Photo tour (Apr 2026 visit)
Six photo-spots our field team checks on every project visit. Captions describe what the shot documents.
What verified buyers said
Sampled from 105 verified reviews.
Risks before you book
What the project includes
- ✓ Clubhouse with co-working
- ✓ Swimming pool + kids’ pool
- ✓ Fully-equipped gymnasium
- ✓ Landscaped gardens + jogging track
- ✓ Indoor games & squash court
- ✓ Children’s play area
- ✓ 24×7 security + CCTV
- ✓ Amphitheatre / party lawn
Configs and all-in costs
Prices include base + floor rise + parking. GST (5%) and registration (~1%) are extra. Last refreshed Apr 2026.
| Config | Carpet + balcony | All-in price | Possession |
|---|---|---|---|
| 2 BHK | 1180 sq ft | ₹1.65 Cr | Mar 2027 |
| 3 BHK | 1720 sq ft | ₹2.40 Cr | Mar 2027 |
| 4 BHK | 3200 sq ft | ₹4.46 Cr | Mar 2027 |
Comparable projects in Bangalore
| Project | Locality | Score | ₹/sqft | Delta vs this |
|---|---|---|---|---|
| Brigade Utopia | Varthur | 7.2/10 | ₹13,547 | ₹-404 |
| Sobha Lake Garden | KR Puram | 7.2/10 | ₹11,182 | ₹-2,769 |
| Sobha Magnus | Bannerghatta | 7.2/10 | ₹12,113 | ₹-1,838 |
Frequently asked
Is Radiance Platinum RERA registered?
Yes. Registration PRM/KA/RERA/1251/313/PR/282802/565 is currently active and verifiable on the Karnataka RERA portal. We verified the status on our Apr 2026 site visit.
What is the Brickplot Score for Radiance Platinum?
We scored Radiance Platinum at 7.2/10 with verdict ‘Buy’. The six-axis breakdown (RERA, Builder, Location, Value, Sentiment, Progress) is shown above.
What is the price range at Radiance Platinum?
Configurations start at roughly ₹1.65 Cr (2 BHK) and go up to ₹3.18 Cr for larger layouts. Per-sqft average is ₹13,951.
When is possession for Radiance Platinum?
Possession is Mar 2027. Under-construction projects almost always slip 6-12 months beyond the RERA-committed date — budget for that.
How far is Radiance Platinum from the nearest metro / key job hub?
Koramangala in Bangalore has decent connectivity to major job corridors. Detailed micro-market connectivity data is covered on the Bangalore hub page.