Sobha Royal Pavilion
Based on 125 verified buyer reviews, a site visit in Mar 2026, and the builder’s delivery track record (200+ delivered · 92% on-time).
How we arrived at 7.5/10
Six weighted axes, each scored against live evidence. Here is the exact math for Sobha Royal Pavilion.
Photo tour (Mar 2026 visit)
Six photo-spots our field team checks on every project visit. Captions describe what the shot documents.
What verified buyers said
Sampled from 125 verified reviews.
Risks before you book
What the project includes
- ✓ Clubhouse with co-working
- ✓ Swimming pool + kids’ pool
- ✓ Fully-equipped gymnasium
- ✓ Landscaped gardens + jogging track
- ✓ Indoor games & squash court
- ✓ Children’s play area
- ✓ 24×7 security + CCTV
- ✓ Amphitheatre / party lawn
Configs and all-in costs
Prices include base + floor rise + parking. GST (5%) and registration (~1%) are extra. Last refreshed Mar 2026.
| Config | Carpet + balcony | All-in price | Possession |
|---|---|---|---|
| 2 BHK | 1320 sq ft | ₹1.78 Cr | Mar 2028 |
| 3 BHK | 1720 sq ft | ₹2.32 Cr | Mar 2028 |
| 4 BHK | 3200 sq ft | ₹4.32 Cr | Mar 2028 |
Comparable projects in Bangalore
| Project | Locality | Score | ₹/sqft | Delta vs this |
|---|---|---|---|---|
| Prestige Fontaine Bleau | Whitefield | 7.5/10 | ₹11,692 | ₹-1,819 |
| Salarpuria Sattva Signet | Sarjapur | 7.5/10 | ₹8,853 | ₹-4,658 |
| Prestige Lavender Fields | Varthur | 7.5/10 | ₹10,160 | ₹-3,351 |
Frequently asked
Is Sobha Royal Pavilion RERA registered?
Yes. Registration PRM/KA/RERA/1251/317/PR/258113/423 is currently active and verifiable on the Karnataka RERA portal. We verified the status on our Mar 2026 site visit.
What is the Brickplot Score for Sobha Royal Pavilion?
We scored Sobha Royal Pavilion at 7.5/10 with verdict ‘Buy’. The six-axis breakdown (RERA, Builder, Location, Value, Sentiment, Progress) is shown above.
What is the price range at Sobha Royal Pavilion?
Configurations start at roughly ₹1.59 Cr (2 BHK) and go up to ₹3.08 Cr for larger layouts. Per-sqft average is ₹13,511.
When is possession for Sobha Royal Pavilion?
Possession is Mar 2028. Under-construction projects almost always slip 6-12 months beyond the RERA-committed date — budget for that.
How far is Sobha Royal Pavilion from the nearest metro / key job hub?
Sarjapur in Bangalore has decent connectivity to major job corridors. Detailed micro-market connectivity data is covered on the Bangalore hub page.