NCC Urban Lake Springs
Based on 124 verified buyer reviews, a site visit in Mar 2026, and the builder’s delivery track record (50+ delivered · 82% on-time).
How we arrived at 6.9/10
Six weighted axes, each scored against live evidence. Here is the exact math for NCC Urban Lake Springs.
Photo tour (Mar 2026 visit)
Six photo-spots our field team checks on every project visit. Captions describe what the shot documents.
What verified buyers said
Sampled from 124 verified reviews.
Risks before you book
What the project includes
- ✓ Clubhouse with co-working
- ✓ Swimming pool + kids’ pool
- ✓ Fully-equipped gymnasium
- ✓ Landscaped gardens + jogging track
- ✓ Indoor games & squash court
- ✓ Children’s play area
- ✓ 24×7 security + CCTV
- ✓ Amphitheatre / party lawn
Configs and all-in costs
Prices include base + floor rise + parking. GST (5%) and registration (~1%) are extra. Last refreshed Mar 2026.
| Config | Carpet + balcony | All-in price | Possession |
|---|---|---|---|
| 1 BHK | 620 sq ft | ₹49 L | Sep 2027 |
| 2 BHK | 980 sq ft | ₹79 L | Sep 2027 |
| 3 BHK | 1480 sq ft | ₹1.19 Cr | Sep 2027 |
Comparable projects in Bangalore
| Project | Locality | Score | ₹/sqft | Delta vs this |
|---|---|---|---|---|
| Assetz Canvas and Cove | Begur | 6.9/10 | ₹13,144 | +₹5,080 |
| Brigade Sevilla | Budigere | 6.9/10 | ₹9,676 | +₹1,612 |
| Godrej Lake Gardens | Bangalore Outer | 6.9/10 | ₹8,736 | +₹672 |
Frequently asked
Is NCC Urban Lake Springs RERA registered?
Yes. Registration PRM/KA/RERA/1251/312/PR/183890/261 is currently active and verifiable on the Karnataka RERA portal. We verified the status on our Mar 2026 site visit.
What is the Brickplot Score for NCC Urban Lake Springs?
We scored NCC Urban Lake Springs at 6.9/10 with verdict ‘Wait’. The six-axis breakdown (RERA, Builder, Location, Value, Sentiment, Progress) is shown above.
What is the price range at NCC Urban Lake Springs?
Configurations start at roughly ₹0.5 Cr (1 BHK) and go up to ₹1.19 Cr for larger layouts. Per-sqft average is ₹8,064.
When is possession for NCC Urban Lake Springs?
Possession is Sep 2027. Under-construction projects almost always slip 6-12 months beyond the RERA-committed date — budget for that.
How far is NCC Urban Lake Springs from the nearest metro / key job hub?
JP Nagar in Bangalore has decent connectivity to major job corridors. Detailed micro-market connectivity data is covered on the Bangalore hub page.