⛔ RERA registration is EXPIRED for Lodha Bellevue.Selling units without valid RERA is a RERA Act violation. Brickplot Score capped at 4.9 — project marked Avoid.
Why we said AvoidExpired RERA forces our guardrail: score cannot exceed 4.9 — no matter builder track record or location strength. Current score 4.1 reflects RERA axis = 2.0.
Site Evidence
Photo tour (Jan 2026 visit)
Six photo-spots our field team checks on every project visit. Captions describe what the shot documents.
Site entrance gate and security cabin
Tower A construction progress — floor level visible
Sample 3 BHK living + dining from doorway
Clubhouse area under finishing work
Amenity deck / pool plan rendering vs built
Surrounding neighbourhood arterial road view
Buyer Voices
What verified buyers said
Sampled from 38 verified reviews. Each reviewer’s status (booked / shortlisted / walked away) is shown.
VERIFIED
★☆☆☆☆
“RERA expired in 2024 and still not renewed. That alone is enough for me to walk away.”
Pradeep I. · Ex-prospect, Dec 2025
VERIFIED
★☆☆☆☆
“Construction has been stalled since Sep 2025 per RTI. Sales team still selling — that’s the red flag.”
Ananya D. · Investigator, Jan 2026
VERIFIED
★★☆☆☆
“Location is genuinely prime. Everything else is a mess.”
Suresh K. · Walked away, Jan 2026
VERIFIED
★☆☆☆☆
“I paid ₹10L booking in 2022. Still waiting on a possession date in 2026.”
Name withheld · Existing buyer, Jan 2026
What To Watch
Three risks before you book
Watch
RERA expired
Registration lapsed in 2024 and has not been renewed. Selling units without valid RERA is a MahaRERA violation. Complaint filed Oct 2025.
Watch
Construction stalled
Independent visit Jan 2026 showed no active labour. Lodha’s 72% on-time record is below peer average.
Watch
Litigation risk
3 buyer complaints pending with MahaRERA consumer forum. Possession refunds historically take 24–36 months.
Pricing
Configs and all-in costs
Prices include base + floor rise + parking. GST (5%) and registration (~1%) are extra. Last refreshed Jan 2026.
RERA expired in 2024 without renewal, construction is stalled per Jan 2026 site verification, and active complaints exist in MahaRERA. The Brickplot Score guardrail caps invalid-RERA projects at 4.9.
Can I get a refund on my existing booking?
Under the RERA Act Section 18, yes — with interest. Practical timeline: file MahaRERA complaint, expect 24–36 months for resolution.
Will RERA be renewed eventually?
Possibly. But until and unless the certificate is reissued with a new number and validity date, this project cannot legally sell. Do not make new bookings.