Dra Centralia
Based on 125 verified buyer reviews, a site visit in Jan 2026, and the builder’s delivery track record (15+ delivered · 75% on-time).
How we arrived at 6.3/10
Six weighted axes, each scored against live evidence. Here is the exact math for Dra Centralia.
Photo tour (Jan 2026 visit)
Six photo-spots our field team checks on every project visit. Captions describe what the shot documents.
What verified buyers said
Sampled from 125 verified reviews.
Risks before you book
What the project includes
- ✓ Clubhouse with co-working
- ✓ Swimming pool + kids’ pool
- ✓ Fully-equipped gymnasium
- ✓ Landscaped gardens + jogging track
- ✓ Indoor games & squash court
- ✓ Children’s play area
- ✓ 24×7 security + CCTV
- ✓ Amphitheatre / party lawn
Configs and all-in costs
Prices include base + floor rise + parking. GST (5%) and registration (~1%) are extra. Last refreshed Jan 2026.
| Config | Carpet + balcony | All-in price | Possession |
|---|---|---|---|
| 2 BHK | 1180 sq ft | ₹89 L | Ready-to-move |
| 3 BHK | 1960 sq ft | ₹1.48 Cr | Ready-to-move |
| 4 BHK | 3200 sq ft | ₹2.42 Cr | Ready-to-move |
Comparable projects in Chennai
| Project | Locality | Score | ₹/sqft | Delta vs this |
|---|---|---|---|---|
| Embassy Residency Perumbakkam | Chennai Outer | 6.3/10 | ₹10,176 | +₹2,605 |
| Purva Windermere Pallikaranai | Chennai Outer | 6.3/10 | ₹13,356 | +₹5,785 |
| Shriram Mangalam Mangadu | Chennai Outer | 6.3/10 | ₹16,112 | +₹8,541 |
Frequently asked
Is Dra Centralia RERA registered?
Yes. Registration TN/01/Building/0366/2024 is currently active and verifiable on the Tamil Nadu RERA portal. We verified the status on our Jan 2026 site visit.
What is the Brickplot Score for Dra Centralia?
We scored Dra Centralia at 6.3/10 with verdict ‘Skip’. The six-axis breakdown (RERA, Builder, Location, Value, Sentiment, Progress) is shown above.
What is the price range at Dra Centralia?
Configurations start at roughly ₹0.89 Cr (2 BHK) and go up to ₹1.73 Cr for larger layouts. Per-sqft average is ₹7,571.
When is possession for Dra Centralia?
Possession is Ready-to-move. Under-construction projects almost always slip 6-12 months beyond the RERA-committed date — budget for that.
How far is Dra Centralia from the nearest metro / key job hub?
Navalur in Chennai has decent connectivity to major job corridors. Detailed micro-market connectivity data is covered on the Chennai hub page.