Lodha Mirabelle Manyata Tech Park
Based on 163 verified buyer reviews, a site visit in Apr 2026, and the builder’s delivery track record (120+ delivered · 88% on-time).
How we arrived at 7.6/10
Six weighted axes, each scored against live evidence. Here is the exact math for Lodha Mirabelle Manyata Tech Park.
Photo tour (Apr 2026 visit)
Six photo-spots our field team checks on every project visit. Captions describe what the shot documents.
What verified buyers said
Sampled from 163 verified reviews.
Risks before you book
What the project includes
- ✓ Clubhouse with co-working
- ✓ Swimming pool + kids’ pool
- ✓ Fully-equipped gymnasium
- ✓ Landscaped gardens + jogging track
- ✓ Indoor games & squash court
- ✓ Children’s play area
- ✓ 24×7 security + CCTV
- ✓ Amphitheatre / party lawn
Configs and all-in costs
Prices include base + floor rise + parking. GST (5%) and registration (~1%) are extra. Last refreshed Apr 2026.
| Config | Carpet + balcony | All-in price | Possession |
|---|---|---|---|
| 2 BHK | 1320 sq ft | ₹1.41 Cr | Dec 2026 |
| 3 BHK | 1720 sq ft | ₹1.84 Cr | Dec 2026 |
| 4 BHK | 3200 sq ft | ₹3.42 Cr | Dec 2026 |
Comparable projects in Bangalore
| Project | Locality | Score | ₹/sqft | Delta vs this |
|---|---|---|---|---|
| Brigade Lakecrest Kr Puram Old | KR Puram | 7.6/10 | ₹11,182 | +₹498 |
| Assetz Codename Kyoto | Yelahanka | 7.6/10 | ₹11,397 | +₹713 |
| Adarsh Pinecourt | Hennur | 7.6/10 | ₹8,736 | ₹-1,948 |
Frequently asked
Is Lodha Mirabelle Manyata Tech Park RERA registered?
Yes. Registration PRM/KA/RERA/1251/304/PR/254136/105 is currently active and verifiable on the Karnataka RERA portal. We verified the status on our Apr 2026 site visit.
What is the Brickplot Score for Lodha Mirabelle Manyata Tech Park?
We scored Lodha Mirabelle Manyata Tech Park at 7.6/10 with verdict ‘Buy’. The six-axis breakdown (RERA, Builder, Location, Value, Sentiment, Progress) is shown above.
What is the price range at Lodha Mirabelle Manyata Tech Park?
Configurations start at roughly ₹1.26 Cr (2 BHK) and go up to ₹2.44 Cr for larger layouts. Per-sqft average is ₹10,684.
When is possession for Lodha Mirabelle Manyata Tech Park?
Possession is Dec 2026. Under-construction projects almost always slip 6-12 months beyond the RERA-committed date — budget for that.
How far is Lodha Mirabelle Manyata Tech Park from the nearest metro / key job hub?
Thanisandra in Bangalore has decent connectivity to major job corridors. Detailed micro-market connectivity data is covered on the Bangalore hub page.