Assetz Mizumi Reserve Kudlu Hsr
Based on 115 verified buyer reviews, a site visit in Apr 2026, and the builder’s delivery track record (120+ delivered · 88% on-time).
How we arrived at 7.9/10
Six weighted axes, each scored against live evidence. Here is the exact math for Assetz Mizumi Reserve Kudlu Hsr.
Photo tour (Apr 2026 visit)
Six photo-spots our field team checks on every project visit. Captions describe what the shot documents.
What verified buyers said
Sampled from 115 verified reviews.
Risks before you book
What the project includes
- ✓ Clubhouse with co-working
- ✓ Swimming pool + kids’ pool
- ✓ Fully-equipped gymnasium
- ✓ Landscaped gardens + jogging track
- ✓ Indoor games & squash court
- ✓ Children’s play area
- ✓ 24×7 security + CCTV
- ✓ Amphitheatre / party lawn
Configs and all-in costs
Prices include base + floor rise + parking. GST (5%) and registration (~1%) are extra. Last refreshed Apr 2026.
| Config | Carpet + balcony | All-in price | Possession |
|---|---|---|---|
| 1 BHK | 720 sq ft | ₹84 L | Mar 2027 |
| 2 BHK | 1320 sq ft | ₹1.56 Cr | Mar 2027 |
| 3 BHK | 1720 sq ft | ₹2.03 Cr | Mar 2027 |
Comparable projects in Bangalore
| Project | Locality | Score | ₹/sqft | Delta vs this |
|---|---|---|---|---|
| Prestige City | Sarjapur | 7.9/10 | ₹14,551 | +₹2,747 |
| Sobha City Athena | Thanisandra | 7.9/10 | ₹9,784 | ₹-2,020 |
| Assetz 18 Oak | Sarjapur | 7.9/10 | ₹13,771 | +₹1,967 |
Frequently asked
Is Assetz Mizumi Reserve Kudlu Hsr RERA registered?
Yes. Registration PRM/KA/RERA/1251/303/PR/208224/696 is currently active and verifiable on the Karnataka RERA portal. We verified the status on our Apr 2026 site visit.
What is the Brickplot Score for Assetz Mizumi Reserve Kudlu Hsr?
We scored Assetz Mizumi Reserve Kudlu Hsr at 7.9/10 with verdict ‘Buy’. The six-axis breakdown (RERA, Builder, Location, Value, Sentiment, Progress) is shown above.
What is the price range at Assetz Mizumi Reserve Kudlu Hsr?
Configurations start at roughly ₹0.73 Cr (1 BHK) and go up to ₹1.75 Cr for larger layouts. Per-sqft average is ₹11,804.
When is possession for Assetz Mizumi Reserve Kudlu Hsr?
Possession is Mar 2027. Under-construction projects almost always slip 6-12 months beyond the RERA-committed date — budget for that.
How far is Assetz Mizumi Reserve Kudlu Hsr from the nearest metro / key job hub?
HSR Layout in Bangalore has decent connectivity to major job corridors. Detailed micro-market connectivity data is covered on the Bangalore hub page.