Signature Global City 81
Based on 38 verified buyer reviews, a site visit in Mar 2026, and the builder’s delivery track record (70+ delivered · 81% on-time).
How we arrived at 6.8/10
Six weighted axes, each scored against live evidence. Here is the exact math for Signature Global City 81.
Photo tour (Mar 2026 visit)
Six photo-spots our field team checks on every project visit. Captions describe what the shot documents.
What verified buyers said
Sampled from 38 verified reviews.
Risks before you book
What the project includes
- ✓ Clubhouse with co-working
- ✓ Swimming pool + kids’ pool
- ✓ Fully-equipped gymnasium
- ✓ Landscaped gardens + jogging track
- ✓ Indoor games & squash court
- ✓ Children’s play area
- ✓ 24×7 security + CCTV
- ✓ Amphitheatre / party lawn
Configs and all-in costs
Prices include base + floor rise + parking. GST (5%) and registration (~1%) are extra. Last refreshed Mar 2026.
| Config | Carpet + balcony | All-in price | Possession |
|---|---|---|---|
| 2 BHK | 1180 sq ft | ₹1.09 Cr | Jun 2028 |
| 3 BHK | 1480 sq ft | ₹1.36 Cr | Jun 2028 |
Comparable projects in Gurugram
| Project | Locality | Score | ₹/sqft | Delta vs this |
|---|---|---|---|---|
| Runwal Gardens | Dombivli | 6.9/10 | ₹9,400 | +₹200 |
| Puravankara Provident Park Square | Kanakapura Road | 7.1/10 | ₹7,400 | ₹-1,800 |
| Godrej Nature’s Basket | Mahalunge | 7.4/10 | ₹8,400 | ₹-800 |
Frequently asked
Is Signature Global City 81 RERA registered?
Yes. Registration GGM/570/302/2024/102 is currently active and verifiable on the Haryana RERA portal. We verified the status on our Mar 2026 site visit.
What is the Brickplot Score for Signature Global City 81?
We scored Signature Global City 81 at 6.8/10 with verdict ‘Wait’. The six-axis breakdown (RERA, Builder, Location, Value, Sentiment, Progress) is shown above.
What is the price range at Signature Global City 81?
Configurations start at roughly ₹1.3 Cr (2 BHK) and go up to ₹1.9 Cr for larger layouts. Per-sqft average is ₹9,200.
When is possession for Signature Global City 81?
Possession is Jun 2028. Under-construction projects almost always slip 6-12 months beyond the RERA-committed date — budget for that.
How far is Signature Global City 81 from the nearest metro / key job hub?
Sector 81 in Gurugram has decent connectivity to major job corridors. Detailed micro-market connectivity data is covered on the Gurugram hub page.