Anvita Ivana Phase 2
Based on 77 verified buyer reviews, a site visit in Mar 2026, and the builder’s delivery track record (15+ delivered · 75% on-time).
How we arrived at 6.3/10
Six weighted axes, each scored against live evidence. Here is the exact math for Anvita Ivana Phase 2.
Photo tour (Mar 2026 visit)
Six photo-spots our field team checks on every project visit. Captions describe what the shot documents.
What verified buyers said
Sampled from 77 verified reviews.
Risks before you book
What the project includes
- ✓ Clubhouse with co-working
- ✓ Swimming pool + kids’ pool
- ✓ Fully-equipped gymnasium
- ✓ Landscaped gardens + jogging track
- ✓ Indoor games & squash court
- ✓ Children’s play area
- ✓ 24×7 security + CCTV
- ✓ Amphitheatre / party lawn
Configs and all-in costs
Prices include base + floor rise + parking. GST (5%) and registration (~1%) are extra. Last refreshed Mar 2026.
| Config | Carpet + balcony | All-in price | Possession |
|---|---|---|---|
| 3 BHK | 1960 sq ft | ₹1.45 Cr | Mar 2028 |
| 4 BHK | 2800 sq ft | ₹2.07 Cr | Mar 2028 |
Comparable projects in Hyderabad
| Project | Locality | Score | ₹/sqft | Delta vs this |
|---|---|---|---|---|
| Brigade Citadel Moti Nagar | Hyderabad Outer | 6.3/10 | ₹6,496 | ₹-885 |
| Prestige Vaishnaoi Rainbow Waters | Hyderabad Outer | 6.3/10 | ₹8,064 | +₹683 |
| EIPL La Paloma | Mokila | 6.3/10 | ₹7,263 | ₹-118 |
Frequently asked
Is Anvita Ivana Phase 2 RERA registered?
Yes. Registration P024000035804 is currently active and verifiable on the Telangana RERA portal. We verified the status on our Mar 2026 site visit.
What is the Brickplot Score for Anvita Ivana Phase 2?
We scored Anvita Ivana Phase 2 at 6.3/10 with verdict ‘Skip’. The six-axis breakdown (RERA, Builder, Location, Value, Sentiment, Progress) is shown above.
What is the price range at Anvita Ivana Phase 2?
Configurations start at roughly ₹1.09 Cr (3 BHK) and go up to ₹1.68 Cr for larger layouts. Per-sqft average is ₹7,381.
When is possession for Anvita Ivana Phase 2?
Possession is Mar 2028. Under-construction projects almost always slip 6-12 months beyond the RERA-committed date — budget for that.
How far is Anvita Ivana Phase 2 from the nearest metro / key job hub?
Kollur in Hyderabad has decent connectivity to major job corridors. Detailed micro-market connectivity data is covered on the Hyderabad hub page.