Pride Rolling Hills Phase 2
Based on 123 verified buyer reviews, a site visit in Jan 2026, and the builder’s delivery track record (40+ delivered · 80% on-time).
How we arrived at 6.4/10
Six weighted axes, each scored against live evidence. Here is the exact math for Pride Rolling Hills Phase 2.
Photo tour (Jan 2026 visit)
Six photo-spots our field team checks on every project visit. Captions describe what the shot documents.
What verified buyers said
Sampled from 123 verified reviews.
Risks before you book
What the project includes
- ✓ Clubhouse with co-working
- ✓ Swimming pool + kids’ pool
- ✓ Fully-equipped gymnasium
- ✓ Landscaped gardens + jogging track
- ✓ Indoor games & squash court
- ✓ Children’s play area
- ✓ 24×7 security + CCTV
- ✓ Amphitheatre / party lawn
Configs and all-in costs
Prices include base + floor rise + parking. GST (5%) and registration (~1%) are extra. Last refreshed Jan 2026.
| Config | Carpet + balcony | All-in price | Possession |
|---|---|---|---|
| 1 BHK | 620 sq ft | ₹60 L | Mar 2028 |
| 2 BHK | 1180 sq ft | ₹1.14 Cr | Mar 2028 |
| 3 BHK | 1960 sq ft | ₹1.90 Cr | Mar 2028 |
Comparable projects in Bangalore
| Project | Locality | Score | ₹/sqft | Delta vs this |
|---|---|---|---|---|
| Prestige Deja Vu | Bangalore Outer | 6.4/10 | ₹10,080 | +₹396 |
| Brigade Valencia | Bangalore Outer | 6.4/10 | ₹8,736 | ₹-948 |
| Prestige Botanique Rv | Bangalore Outer | 6.4/10 | ₹8,736 | ₹-948 |
Frequently asked
Is Pride Rolling Hills Phase 2 RERA registered?
Yes. Registration PRM/KA/RERA/1251/320/PR/191954/652 is currently active and verifiable on the Karnataka RERA portal. We verified the status on our Jan 2026 site visit.
What is the Brickplot Score for Pride Rolling Hills Phase 2?
We scored Pride Rolling Hills Phase 2 at 6.4/10 with verdict ‘Skip’. The six-axis breakdown (RERA, Builder, Location, Value, Sentiment, Progress) is shown above.
What is the price range at Pride Rolling Hills Phase 2?
Configurations start at roughly ₹0.6 Cr (1 BHK) and go up to ₹1.43 Cr for larger layouts. Per-sqft average is ₹9,684.
When is possession for Pride Rolling Hills Phase 2?
Possession is Mar 2028. Under-construction projects almost always slip 6-12 months beyond the RERA-committed date — budget for that.
How far is Pride Rolling Hills Phase 2 from the nearest metro / key job hub?
Jigani in Bangalore has decent connectivity to major job corridors. Detailed micro-market connectivity data is covered on the Bangalore hub page.