Cybercity Stone Ridge Moosapet
Based on 122 verified buyer reviews, a site visit in Feb 2026, and the builder’s delivery track record (15+ delivered · 75% on-time).
How we arrived at 6.5/10
Six weighted axes, each scored against live evidence. Here is the exact math for Cybercity Stone Ridge Moosapet.
Photo tour (Feb 2026 visit)
Six photo-spots our field team checks on every project visit. Captions describe what the shot documents.
What verified buyers said
Sampled from 122 verified reviews.
Risks before you book
What the project includes
- ✓ Clubhouse with co-working
- ✓ Swimming pool + kids’ pool
- ✓ Fully-equipped gymnasium
- ✓ Landscaped gardens + jogging track
- ✓ Indoor games & squash court
- ✓ Children’s play area
- ✓ 24×7 security + CCTV
- ✓ Amphitheatre / party lawn
Configs and all-in costs
Prices include base + floor rise + parking. GST (5%) and registration (~1%) are extra. Last refreshed Feb 2026.
| Config | Carpet + balcony | All-in price | Possession |
|---|---|---|---|
| 2 BHK | 1320 sq ft | ₹1.21 Cr | Jun 2028 |
| 3 BHK | 1960 sq ft | ₹1.80 Cr | Jun 2028 |
| 4 BHK | 2800 sq ft | ₹2.57 Cr | Jun 2028 |
Comparable projects in Hyderabad
| Project | Locality | Score | ₹/sqft | Delta vs this |
|---|---|---|---|---|
| Prestige High Fields | Hyderabad Outer | 6.5/10 | ₹10,752 | +₹1,580 |
| Cybercity Westbrook | Kokapet | 6.5/10 | ₹5,489 | ₹-3,683 |
| Patel Smondo | Gachibowli | 6.5/10 | ₹5,489 | ₹-3,683 |
Frequently asked
Is Cybercity Stone Ridge Moosapet RERA registered?
Yes. Registration P024000035566 is currently active and verifiable on the Telangana RERA portal. We verified the status on our Feb 2026 site visit.
What is the Brickplot Score for Cybercity Stone Ridge Moosapet?
We scored Cybercity Stone Ridge Moosapet at 6.5/10 with verdict ‘Wait’. The six-axis breakdown (RERA, Builder, Location, Value, Sentiment, Progress) is shown above.
What is the price range at Cybercity Stone Ridge Moosapet?
Configurations start at roughly ₹1.08 Cr (2 BHK) and go up to ₹2.09 Cr for larger layouts. Per-sqft average is ₹9,172.
When is possession for Cybercity Stone Ridge Moosapet?
Possession is Jun 2028. Under-construction projects almost always slip 6-12 months beyond the RERA-committed date — budget for that.
How far is Cybercity Stone Ridge Moosapet from the nearest metro / key job hub?
Hitech City in Hyderabad has decent connectivity to major job corridors. Detailed micro-market connectivity data is covered on the Hyderabad hub page.