Ckpc Winds of Change
Based on 117 verified buyer reviews, a site visit in Mar 2026, and the builder’s delivery track record (15+ delivered · 75% on-time).
How we arrived at 6.1/10
Six weighted axes, each scored against live evidence. Here is the exact math for Ckpc Winds of Change.
Photo tour (Mar 2026 visit)
Six photo-spots our field team checks on every project visit. Captions describe what the shot documents.
What verified buyers said
Sampled from 117 verified reviews.
Risks before you book
What the project includes
- ✓ Clubhouse with co-working
- ✓ Swimming pool + kids’ pool
- ✓ Fully-equipped gymnasium
- ✓ Landscaped gardens + jogging track
- ✓ Indoor games & squash court
- ✓ Children’s play area
- ✓ 24×7 security + CCTV
- ✓ Amphitheatre / party lawn
Configs and all-in costs
Prices include base + floor rise + parking. GST (5%) and registration (~1%) are extra. Last refreshed Mar 2026.
| Config | Carpet + balcony | All-in price | Possession |
|---|---|---|---|
| 2 BHK | 980 sq ft | ₹95 L | Jun 2028 |
| 3 BHK | 1720 sq ft | ₹1.68 Cr | Jun 2028 |
| 4 BHK | 2800 sq ft | ₹2.74 Cr | Jun 2028 |
Comparable projects in Bangalore
| Project | Locality | Score | ₹/sqft | Delta vs this |
|---|---|---|---|---|
| Assetz Sun and Sanctum | Bangalore Outer | 6.1/10 | ₹11,872 | +₹2,088 |
| Purva Coronation Square | Bangalore Outer | 6.1/10 | ₹6,572 | ₹-3,212 |
| Salarpuria Sattva Opus | Bangalore Outer | 6.1/10 | ₹6,572 | ₹-3,212 |
Frequently asked
Is Ckpc Winds of Change RERA registered?
Yes. Registration PRM/KA/RERA/1251/319/PR/222792/207 is currently active and verifiable on the Karnataka RERA portal. We verified the status on our Mar 2026 site visit.
What is the Brickplot Score for Ckpc Winds of Change?
We scored Ckpc Winds of Change at 6.1/10 with verdict ‘Skip’. The six-axis breakdown (RERA, Builder, Location, Value, Sentiment, Progress) is shown above.
What is the price range at Ckpc Winds of Change?
Configurations start at roughly ₹1.15 Cr (2 BHK) and go up to ₹2.23 Cr for larger layouts. Per-sqft average is ₹9,784.
When is possession for Ckpc Winds of Change?
Possession is Jun 2028. Under-construction projects almost always slip 6-12 months beyond the RERA-committed date — budget for that.
How far is Ckpc Winds of Change from the nearest metro / key job hub?
Yelahanka in Bangalore has decent connectivity to major job corridors. Detailed micro-market connectivity data is covered on the Bangalore hub page.