Arvind Codename Unlimited
Based on 86 verified buyer reviews, a site visit in Apr 2026, and the builder’s delivery track record (15+ delivered · 75% on-time).
How we arrived at 6.7/10
Six weighted axes, each scored against live evidence. Here is the exact math for Arvind Codename Unlimited.
Photo tour (Apr 2026 visit)
Six photo-spots our field team checks on every project visit. Captions describe what the shot documents.
What verified buyers said
Sampled from 86 verified reviews.
Risks before you book
What the project includes
- ✓ Clubhouse with co-working
- ✓ Swimming pool + kids’ pool
- ✓ Fully-equipped gymnasium
- ✓ Landscaped gardens + jogging track
- ✓ Indoor games & squash court
- ✓ Children’s play area
- ✓ 24×7 security + CCTV
- ✓ Amphitheatre / party lawn
Configs and all-in costs
Prices include base + floor rise + parking. GST (5%) and registration (~1%) are extra. Last refreshed Apr 2026.
| Config | Carpet + balcony | All-in price | Possession |
|---|---|---|---|
| 1 BHK | 720 sq ft | ₹70 L | Mar 2028 |
| 2 BHK | 980 sq ft | ₹95 L | Mar 2028 |
| 3 BHK | 1960 sq ft | ₹1.92 Cr | Mar 2028 |
Comparable projects in Bangalore
| Project | Locality | Score | ₹/sqft | Delta vs this |
|---|---|---|---|---|
| Brigade Buena Vista | Bangalore Outer | 6.7/10 | ₹9,408 | ₹-376 |
| Concorde Abode 99 Sarjapur Hosur | Sarjapur | 6.7/10 | ₹6,975 | ₹-2,809 |
| Godrej 24 | Bangalore Outer | 6.7/10 | ₹13,888 | +₹4,104 |
Frequently asked
Is Arvind Codename Unlimited RERA registered?
Yes. Registration PRM/KA/RERA/1251/316/PR/136210/330 is currently active and verifiable on the Karnataka RERA portal. We verified the status on our Apr 2026 site visit.
What is the Brickplot Score for Arvind Codename Unlimited?
We scored Arvind Codename Unlimited at 6.7/10 with verdict ‘Wait’. The six-axis breakdown (RERA, Builder, Location, Value, Sentiment, Progress) is shown above.
What is the price range at Arvind Codename Unlimited?
Configurations start at roughly ₹0.61 Cr (1 BHK) and go up to ₹1.45 Cr for larger layouts. Per-sqft average is ₹9,784.
When is possession for Arvind Codename Unlimited?
Possession is Mar 2028. Under-construction projects almost always slip 6-12 months beyond the RERA-committed date — budget for that.
How far is Arvind Codename Unlimited from the nearest metro / key job hub?
Yelahanka in Bangalore has decent connectivity to major job corridors. Detailed micro-market connectivity data is covered on the Bangalore hub page.