Kumari Nautilus Soukya
Based on 126 verified buyer reviews, a site visit in Apr 2026, and the builder’s delivery track record (15+ delivered · 75% on-time).
How we arrived at 6.8/10
Six weighted axes, each scored against live evidence. Here is the exact math for Kumari Nautilus Soukya.
Photo tour (Apr 2026 visit)
Six photo-spots our field team checks on every project visit. Captions describe what the shot documents.
What verified buyers said
Sampled from 126 verified reviews.
Risks before you book
What the project includes
- ✓ Clubhouse with co-working
- ✓ Swimming pool + kids’ pool
- ✓ Fully-equipped gymnasium
- ✓ Landscaped gardens + jogging track
- ✓ Indoor games & squash court
- ✓ Children’s play area
- ✓ 24×7 security + CCTV
- ✓ Amphitheatre / party lawn
Configs and all-in costs
Prices include base + floor rise + parking. GST (5%) and registration (~1%) are extra. Last refreshed Apr 2026.
| Config | Carpet + balcony | All-in price | Possession |
|---|---|---|---|
| 2 BHK | 1320 sq ft | ₹1.56 Cr | Dec 2027 |
| 3 BHK | 1960 sq ft | ₹2.32 Cr | Dec 2027 |
Comparable projects in Bangalore
| Project | Locality | Score | ₹/sqft | Delta vs this |
|---|---|---|---|---|
| Adarsh Tropica Choodasandra | Sarjapur | 6.8/10 | ₹9,744 | ₹-2,078 |
| Prestige Marigold Bettenahalli | Bangalore Outer | 6.8/10 | ₹8,064 | ₹-3,758 |
| Sattva Ashraya Bidadi Mysore | Mysore Road | 6.8/10 | ₹11,397 | ₹-425 |
Frequently asked
Is Kumari Nautilus Soukya RERA registered?
Yes. Registration PRM/KA/RERA/1251/305/PR/221070/455 is currently active and verifiable on the Karnataka RERA portal. We verified the status on our Apr 2026 site visit.
What is the Brickplot Score for Kumari Nautilus Soukya?
We scored Kumari Nautilus Soukya at 6.8/10 with verdict ‘Wait’. The six-axis breakdown (RERA, Builder, Location, Value, Sentiment, Progress) is shown above.
What is the price range at Kumari Nautilus Soukya?
Configurations start at roughly ₹1.16 Cr (2 BHK) and go up to ₹1.75 Cr for larger layouts. Per-sqft average is ₹11,822.
When is possession for Kumari Nautilus Soukya?
Possession is Dec 2027. Under-construction projects almost always slip 6-12 months beyond the RERA-committed date — budget for that.
How far is Kumari Nautilus Soukya from the nearest metro / key job hub?
Whitefield in Bangalore has decent connectivity to major job corridors. Detailed micro-market connectivity data is covered on the Bangalore hub page.