SBR Florenso
Based on 83 verified buyer reviews, a site visit in Mar 2026, and the builder’s delivery track record (25+ delivered · 78% on-time).
How we arrived at 6.4/10
Six weighted axes, each scored against live evidence. Here is the exact math for SBR Florenso.
Photo tour (Mar 2026 visit)
Six photo-spots our field team checks on every project visit. Captions describe what the shot documents.
What verified buyers said
Sampled from 83 verified reviews.
Risks before you book
What the project includes
- ✓ Clubhouse with co-working
- ✓ Swimming pool + kids’ pool
- ✓ Fully-equipped gymnasium
- ✓ Landscaped gardens + jogging track
- ✓ Indoor games & squash court
- ✓ Children’s play area
- ✓ 24×7 security + CCTV
- ✓ Amphitheatre / party lawn
Configs and all-in costs
Prices include base + floor rise + parking. GST (5%) and registration (~1%) are extra. Last refreshed Mar 2026.
| Config | Carpet + balcony | All-in price | Possession |
|---|---|---|---|
| 1 BHK | 620 sq ft | ₹45 L | Ready-to-move |
| 2 BHK | 1320 sq ft | ₹97 L | Ready-to-move |
| 3 BHK | 1480 sq ft | ₹1.10 Cr | Ready-to-move |
Comparable projects in Bangalore
| Project | Locality | Score | ₹/sqft | Delta vs this |
|---|---|---|---|---|
| Prestige Deja Vu | Bangalore Outer | 6.4/10 | ₹10,080 | +₹2,667 |
| Brigade Valencia | Bangalore Outer | 6.4/10 | ₹8,736 | +₹1,323 |
| Prestige Botanique Rv | Bangalore Outer | 6.4/10 | ₹8,736 | +₹1,323 |
Frequently asked
Is SBR Florenso RERA registered?
Yes. Registration PRM/KA/RERA/1251/310/PR/186369/589 is currently active and verifiable on the Karnataka RERA portal. We verified the status on our Mar 2026 site visit.
What is the Brickplot Score for SBR Florenso?
We scored SBR Florenso at 6.4/10 with verdict ‘Skip’. The six-axis breakdown (RERA, Builder, Location, Value, Sentiment, Progress) is shown above.
What is the price range at SBR Florenso?
Configurations start at roughly ₹0.46 Cr (1 BHK) and go up to ₹1.1 Cr for larger layouts. Per-sqft average is ₹7,413.
When is possession for SBR Florenso?
Possession is Ready-to-move. Under-construction projects almost always slip 6-12 months beyond the RERA-committed date — budget for that.
How far is SBR Florenso from the nearest metro / key job hub?
Whitefield in Bangalore has decent connectivity to major job corridors. Detailed micro-market connectivity data is covered on the Bangalore hub page.