Axis Capstone Flowing Tree
Based on 30 verified buyer reviews, a site visit in Apr 2026, and the builder’s delivery track record (40+ delivered · 80% on-time).
How we arrived at 7.0/10
Six weighted axes, each scored against live evidence. Here is the exact math for Axis Capstone Flowing Tree.
Photo tour (Apr 2026 visit)
Six photo-spots our field team checks on every project visit. Captions describe what the shot documents.
What verified buyers said
Sampled from 30 verified reviews.
Risks before you book
What the project includes
- ✓ Clubhouse with co-working
- ✓ Swimming pool + kids’ pool
- ✓ Fully-equipped gymnasium
- ✓ Landscaped gardens + jogging track
- ✓ Indoor games & squash court
- ✓ Children’s play area
- ✓ 24×7 security + CCTV
- ✓ Amphitheatre / party lawn
Configs and all-in costs
Prices include base + floor rise + parking. GST (5%) and registration (~1%) are extra. Last refreshed Apr 2026.
| Config | Carpet + balcony | All-in price | Possession |
|---|---|---|---|
| 3 BHK | 1720 sq ft | ₹1.94 Cr | Mar 2028 |
| 4 BHK | 2800 sq ft | ₹3.16 Cr | Mar 2028 |
Comparable projects in Bangalore
| Project | Locality | Score | ₹/sqft | Delta vs this |
|---|---|---|---|---|
| Assetz Codename the Hideaway | Devanahalli | 7.0/10 | ₹9,260 | ₹-2,038 |
| Casagrand Florella | Sarjapur | 7.0/10 | ₹9,744 | ₹-1,554 |
| Sattva Aeropolis Bangalore Airport | Devanahalli | 7.0/10 | ₹8,072 | ₹-3,226 |
Frequently asked
Is Axis Capstone Flowing Tree RERA registered?
Yes. Registration PRM/KA/RERA/1251/314/PR/264861/921 is currently active and verifiable on the Karnataka RERA portal. We verified the status on our Apr 2026 site visit.
What is the Brickplot Score for Axis Capstone Flowing Tree?
We scored Axis Capstone Flowing Tree at 7.0/10 with verdict ‘Buy’. The six-axis breakdown (RERA, Builder, Location, Value, Sentiment, Progress) is shown above.
What is the price range at Axis Capstone Flowing Tree?
Configurations start at roughly ₹1.67 Cr (3 BHK) and go up to ₹2.58 Cr for larger layouts. Per-sqft average is ₹11,298.
When is possession for Axis Capstone Flowing Tree?
Possession is Mar 2028. Under-construction projects almost always slip 6-12 months beyond the RERA-committed date — budget for that.
How far is Axis Capstone Flowing Tree from the nearest metro / key job hub?
Yelahanka in Bangalore has decent connectivity to major job corridors. Detailed micro-market connectivity data is covered on the Bangalore hub page.