Concorde Elements of Earth
Based on 146 verified buyer reviews, a site visit in Mar 2026, and the builder’s delivery track record (40+ delivered · 80% on-time).
How we arrived at 6.9/10
Six weighted axes, each scored against live evidence. Here is the exact math for Concorde Elements of Earth.
Photo tour (Mar 2026 visit)
Six photo-spots our field team checks on every project visit. Captions describe what the shot documents.
What verified buyers said
Sampled from 146 verified reviews.
Risks before you book
What the project includes
- ✓ Clubhouse with co-working
- ✓ Swimming pool + kids’ pool
- ✓ Fully-equipped gymnasium
- ✓ Landscaped gardens + jogging track
- ✓ Indoor games & squash court
- ✓ Children’s play area
- ✓ 24×7 security + CCTV
- ✓ Amphitheatre / party lawn
Configs and all-in costs
Prices include base + floor rise + parking. GST (5%) and registration (~1%) are extra. Last refreshed Mar 2026.
| Config | Carpet + balcony | All-in price | Possession |
|---|---|---|---|
| 2 BHK | 980 sq ft | ₹89 L | Mar 2028 |
| 3 BHK | 1960 sq ft | ₹1.79 Cr | Mar 2028 |
Comparable projects in Bangalore
| Project | Locality | Score | ₹/sqft | Delta vs this |
|---|---|---|---|---|
| Assetz Canvas and Cove | Begur | 6.9/10 | ₹13,144 | +₹4,019 |
| Brigade Sevilla | Budigere | 6.9/10 | ₹9,676 | +₹551 |
| Godrej Lake Gardens | Bangalore Outer | 6.9/10 | ₹8,736 | ₹-389 |
Frequently asked
Is Concorde Elements of Earth RERA registered?
Yes. Registration PRM/KA/RERA/1251/306/PR/155177/914 is currently active and verifiable on the Karnataka RERA portal. We verified the status on our Mar 2026 site visit.
What is the Brickplot Score for Concorde Elements of Earth?
We scored Concorde Elements of Earth at 6.9/10 with verdict ‘Wait’. The six-axis breakdown (RERA, Builder, Location, Value, Sentiment, Progress) is shown above.
What is the price range at Concorde Elements of Earth?
Configurations start at roughly ₹0.89 Cr (2 BHK) and go up to ₹1.35 Cr for larger layouts. Per-sqft average is ₹9,125.
When is possession for Concorde Elements of Earth?
Possession is Mar 2028. Under-construction projects almost always slip 6-12 months beyond the RERA-committed date — budget for that.
How far is Concorde Elements of Earth from the nearest metro / key job hub?
Kanakapura Road in Bangalore has decent connectivity to major job corridors. Detailed micro-market connectivity data is covered on the Bangalore hub page.