Candeur Twins
Based on 102 verified buyer reviews, a site visit in Jan 2026, and the builder’s delivery track record (80+ delivered · 85% on-time).
How we arrived at 6.8/10
Six weighted axes, each scored against live evidence. Here is the exact math for Candeur Twins.
Photo tour (Jan 2026 visit)
Six photo-spots our field team checks on every project visit. Captions describe what the shot documents.
What verified buyers said
Sampled from 102 verified reviews.
Risks before you book
What the project includes
- ✓ Clubhouse with co-working
- ✓ Swimming pool + kids’ pool
- ✓ Fully-equipped gymnasium
- ✓ Landscaped gardens + jogging track
- ✓ Indoor games & squash court
- ✓ Children’s play area
- ✓ 24×7 security + CCTV
- ✓ Amphitheatre / party lawn
Configs and all-in costs
Prices include base + floor rise + parking. GST (5%) and registration (~1%) are extra. Last refreshed Jan 2026.
| Config | Carpet + balcony | All-in price | Possession |
|---|---|---|---|
| 1 BHK | 620 sq ft | ₹35 L | Dec 2026 |
| 2 BHK | 1180 sq ft | ₹68 L | Dec 2026 |
| 3 BHK | 1480 sq ft | ₹85 L | Dec 2026 |
Comparable projects in Hyderabad
| Project | Locality | Score | ₹/sqft | Delta vs this |
|---|---|---|---|---|
| Prestige Spring Heights Apartments in | Hyderabad Outer | 6.8/10 | ₹6,944 | +₹1,160 |
| Koncept Botanika | Gachibowli | 6.8/10 | ₹6,121 | +₹337 |
| Sas Crown Kokapet Hyderabad | Kokapet | 6.8/10 | ₹7,600 | +₹1,816 |
Frequently asked
Is Candeur Twins RERA registered?
Yes. Registration P024000035582 is currently active and verifiable on the Telangana RERA portal. We verified the status on our Jan 2026 site visit.
What is the Brickplot Score for Candeur Twins?
We scored Candeur Twins at 6.8/10 with verdict ‘Wait’. The six-axis breakdown (RERA, Builder, Location, Value, Sentiment, Progress) is shown above.
What is the price range at Candeur Twins?
Configurations start at roughly ₹0.36 Cr (1 BHK) and go up to ₹0.86 Cr for larger layouts. Per-sqft average is ₹5,784.
When is possession for Candeur Twins?
Possession is Dec 2026. Under-construction projects almost always slip 6-12 months beyond the RERA-committed date — budget for that.
How far is Candeur Twins from the nearest metro / key job hub?
Miyapur in Hyderabad has decent connectivity to major job corridors. Detailed micro-market connectivity data is covered on the Hyderabad hub page.