Whitefield
Bangalore’s original IT suburb — mature inventory, deep rental demand, and the Phase 2 metro arriving in August 2026 is finally closing the commute gap.
The numbers that matter
Aggregated from RERA filings, registered sale deeds, and Brickplot’s project tracker. Refreshed quarterly.
Connectivity
The commute math: metro, arterial roads, and tech parks that define pricing today.
Purple Line Phase 2 (Whitefield–KR Puram) opens August 2026; 4 stations inside the locality — Kadugodi, Hopefarm, Channasandra, and Whitefield Terminal.
Outer Ring Road 8 km west; Old Madras Road connects to CBD in 45–60 min; Varthur-Sarjapur Road under widening.
ITPL (120+ firms, ~90K headcount), EPIP Zone, Brigade Tech Park, and Prestige Shantiniketan’s 2.7M sqft commercial block — the original employment anchor.
Schools, hospitals, malls within 5 km
Named anchors drive rent and resale premiums. Distances are straight-line estimates, not drive time.
Projects in Whitefield
Every project below has been scored on our 6-axis framework (RERA, Builder, Location, Value, Sentiment, Progress).
Whitefield vs Sarjapur Road
Which wins in 2026?
Whitefield is the safer pick today — mature social infra, listed inventory, and Phase 2 metro is real steel-and-concrete with a committed Aug-2026 date. Sarjapur trades at a ~10% discount per sqft but STRR won’t land before 2028, and you’re betting on road-only connectivity for the next two years. If you’re a user-end buyer with 2-year horizon, Whitefield. If you’re a 5-year investor willing to ride infra delays, Sarjapur’s delta is real.
Run the full comparator →Get Whitefield’s quarterly report
RERA filings, new launches, price moves, absorption rate. One email per quarter. No spam.
Frequently asked
What’s the Khata situation in Whitefield?
Whitefield is a mix — older villages (Kadugodi, Hoodi, Siddapura) still carry B-Khata plots, while all major gated projects since 2018 are on A-Khata clearly. Insist on a 30-year title trace and RTC verification, especially for plots south of Whitefield Main Road.
How clean are BBMP approvals here?
BBMP plan sanctions here are reliable — Whitefield was brought under BBMP in 2007, and approval turnaround for RERA-registered builders runs 4–6 months. The known friction is BESCOM load sanction and BWSSB water connection, which can add 2–3 months post-OC.
Are most projects here RERA-registered?
Yes — ~92% of projects launched since 2020 in Whitefield are RERA-registered (state average is ~78%). The small exceptions are villa-plot developments under 1 acre, which fall below the RERA threshold; those you should scrutinize the Khata and approval chain directly.