Sumadhura Folium Phase 2
Based on 69 verified buyer reviews, a site visit in Feb 2026, and the builder’s delivery track record (80+ delivered · 85% on-time).
How we arrived at 7.4/10
Six weighted axes, each scored against live evidence. Here is the exact math for Sumadhura Folium Phase 2.
Photo tour (Feb 2026 visit)
Six photo-spots our field team checks on every project visit. Captions describe what the shot documents.
What verified buyers said
Sampled from 69 verified reviews.
Risks before you book
What the project includes
- ✓ Clubhouse with co-working
- ✓ Swimming pool + kids’ pool
- ✓ Fully-equipped gymnasium
- ✓ Landscaped gardens + jogging track
- ✓ Indoor games & squash court
- ✓ Children’s play area
- ✓ 24×7 security + CCTV
- ✓ Amphitheatre / party lawn
Configs and all-in costs
Prices include base + floor rise + parking. GST (5%) and registration (~1%) are extra. Last refreshed Feb 2026.
| Config | Carpet + balcony | All-in price | Possession |
|---|---|---|---|
| 2 BHK | 980 sq ft | ₹1.12 Cr | Ready-to-move |
| 3 BHK | 1480 sq ft | ₹1.70 Cr | Ready-to-move |
Comparable projects in Bangalore
| Project | Locality | Score | ₹/sqft | Delta vs this |
|---|---|---|---|---|
| Prestige Finsbury Park Regent Hyde | Bagalur | 7.4/10 | ₹12,113 | +₹643 |
| Prestige Pine Forest | Whitefield | 7.4/10 | ₹16,108 | +₹4,638 |
| Prestige Somerville | Whitefield | 7.4/10 | ₹8,833 | ₹-2,637 |
Frequently asked
Is Sumadhura Folium Phase 2 RERA registered?
Yes. Registration PRM/KA/RERA/1251/314/PR/120640/600 is currently active and verifiable on the Karnataka RERA portal. We verified the status on our Feb 2026 site visit.
What is the Brickplot Score for Sumadhura Folium Phase 2?
We scored Sumadhura Folium Phase 2 at 7.4/10 with verdict ‘Buy’. The six-axis breakdown (RERA, Builder, Location, Value, Sentiment, Progress) is shown above.
What is the price range at Sumadhura Folium Phase 2?
Configurations start at roughly ₹1.12 Cr (2 BHK) and go up to ₹1.7 Cr for larger layouts. Per-sqft average is ₹11,470.
When is possession for Sumadhura Folium Phase 2?
Possession is Ready-to-move. Under-construction projects almost always slip 6-12 months beyond the RERA-committed date — budget for that.
How far is Sumadhura Folium Phase 2 from the nearest metro / key job hub?
Whitefield in Bangalore has decent connectivity to major job corridors. Detailed micro-market connectivity data is covered on the Bangalore hub page.